background image

17

1. Connect Y-terminal in furnace as shown for proper blower operation.
2. Some thermostats require a “C” terminal connection as shown.
3. If any of the original wire, as supplied, must be replaced, use same

type or equivalent wire.

FIELD 24--V WIRING

FIELD 115--, 208/230--, 460--VWIRING

FACTORY 24--VWIRING

FACTORY 115--V WIRING

NOTE 2

208/230-- OR

460--V

THREE

PHASE

208/230--V

SINGLE

PHASE

FURNACE

115--V FIELD--

AUXILIARY

O

SUPPLIED

J--BOX

L

DISCONNECT

24--V

TERMINAL

TWO

BLOCK

THREE--WIRE

HEATING--ONLY

FIVE WIRE

DISCONNECT

NOTE 1

FIELD--SUPPLIED

CONDENSING

UNIT

WIRE

C

O

N

T

R

R

G

WC

RG

Y

GND

GND

BLOWER DOOR SWITCH

WHT

BLK

WHT

BLK

W

GND

THERMOSTAT

TERMINALS

A02174

NOTES:

Fig. 17 -- Field Wiring

A07727

Blower Off
Delay Jumper

24 VAC
HUM

FUSE

115 VAC
HUM

Diagnostic Light

EAC

Fig. 18 -- Control Center

4. Check igniter resistance. Igniter resistance is affected by

temperature. Only check resistance when the igniter is at
room temperature.

a. Using an ohm meter, check resistance across both

igniter leads in connector.

b. Cold reading should be between 40 ohms and 70 ohms.

5. Remove igniter.

BURN HAZARD

Failure to follow this caution may result in personal injury.
Allow igniter to cool before removal. Normal operating

temperatures exceed 2000

°

F.

CAUTION

!

a. Using a 1/4 in. driver, remove the single screw securing

the igniter bracket to the burner box and carefully

withdraw the igniter through the bottom of the burner
box without striking the igniter on surrounding parts.

b. Inspect igniter for signs of damage or failure.

UNIT DAMAGE HAZARD

Failure to follow this caution may result in premature failure

of the igniter.

The igniter is fragile. DO NOT allow it to hit the side of the

burner box opening while removing or replacing it.

CAUTION

!

c. If replacement is required, replace igniter on igniter

bracket and then install assembly into burner box to

avoid damage to the igniter.

6. To replace igniter and bracket assembly, reverse items 5a

and 5b.

7. Reconnect igniter wire connection.

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury

or death.
Igniter wires must be securely placed in slot in manifold

grommet or else they could become pinched or severed and

electrically shorted.

!

WARNING

PG

9M

TA

V

Содержание PG9MTAV

Страница 1: ...RAL 2 ELECTROSTATIC DISCHARGE ESD PRECAUTIONS 2 CARE AND MAINTENANCE 3 Cleaning and or Replacing Air Filter 3 Blower Motor and Wheel Maintenance 3 Cleaning Burners 4 Cleaning Heat Exchangers 15 Primary Heat Exchangers 15 Secondary Heat Exchangers 15 Flushing Collector Box and Drainage System 15 Servicing Hot Surface Igniter 16 Electrical Controls And Wiring 18 Checking Heat Tape Operation If Appli...

Страница 2: ...ed in an upflow application An upflow furnace application is where the blower is located below the combustion and controls section of the furnace and conditioned air is discharged upward Since this furnace can be installed in any of the 4 positions shown in Fig 1 you may need to revise your orientation to component location accordingly ELECTROSTATIC DISCHARGE ESD PRECAUTIONS UNIT DAMAGE HAZARD Fai...

Страница 3: ...hrough filter in opposite direction of airflow 5 Rinse filter and let dry Oiling or coating of filter is not recommended 6 Slide filter into furnace 7 Replace blower door 8 Turn on electrical supply to furnace Procedure 2 Blower Motor and Wheel Maintenance To ensure long life economy and high efficiency clean accumulated dirt and grease from blower wheel and motor annually The inducer and blower m...

Страница 4: ...fer to furnace wiring diagram and connect thermostat leads if previously disconnected See Fig 18 UNIT DAMAGE HAZARD Failure to follow this caution may result in unit component damage Heating speed selection MUST be adjusted to provide proper temperature rise as specified on the rating plate CAUTION 14 Turn on electrical supply Manually close blower access door switch Use a piece of tape to hold sw...

Страница 5: ...K HAZARD Failure to follow this warning could result in personal injury or death Igniter wires must be securely placed in slot in manifold grommet or else they could become pinched or severed and electrically shorted WARNING 12 Reconnect wires to gas valve and igniter Refer to furnace wiring diagram for proper wire location 13 Reinstall gas supply pipe to furnace gas control valve using backup wre...

Страница 6: ...6 A07706 Fig 6 Upload Installations Top Vent PG9MTAV ...

Страница 7: ...7 A07707 A07707 Fig 7 Upload Installations Vent Through Left Side PG9MTAV ...

Страница 8: ...8 A07708 Fig 8 All Models Vent Through Right Side PG9MTAV ...

Страница 9: ...9 A07829 Fig 9 Downflow Left Side Vent and Trap PG9MTAV ...

Страница 10: ...10 A07830 Fig 10 Downflow Right Side Vent and Trap PG9MTAV ...

Страница 11: ...11 A07709 Fig 11 Horizontal Left Through Top PG9MTAV ...

Страница 12: ...12 A07710 Fig 12 Horizontal Left Side Vent PG9MTAV ...

Страница 13: ...13 A07711 Fig 13 Horizontal Right Through Top PG9MTAV ...

Страница 14: ...14 A07712 Fig 14 Horizontal Right Side Vent PG9MTAV ...

Страница 15: ...ter cleaning inspect heat exchangers to ensure they are free of all foreign objects that may restrict flow of combustion products 7 Reverse items 4 and 5 for reassembly UNIT MAY NOT OPERATE Failure to follow this caution may result in improper unit operation The ground wire from the gas valve MUST be attached to the burner box attachment screw or furnace lockout may occur CAUTION 8 Refer to furnac...

Страница 16: ... lb of torque NOTE If gasket between inducer housing and collector box is damaged in any way it must be replaced See Fig 16 11 Refer to furnace wiring diagram and connect wires to inducer motor and pressure switch or connectors 12 Reconnect pressure tubes to pressure switch See diagram on main furnace door for proper location of tubes Be sure tubes are not kinked See Fig 6 7 or 8 13 Turn on gas an...

Страница 17: ...ading should be between 40 ohms and 70 ohms 5 Remove igniter BURN HAZARD Failure to follow this caution may result in personal injury Allow igniter to cool before removal Normal operating temperatures exceed 2000 F CAUTION a Using a 1 4 in driver remove the single screw securing the igniter bracket to the burner box and carefully withdraw the igniter through the bottom of the burner box without st...

Страница 18: ...around the condensate drain trap and drain line There is no need to use heat tape within the furnace casing Most heat tapes are temperature activated and it is not practical to verify the actual heating of the tape Check the following 1 Check for signs of physical damage to heat tape such as nicks cuts abrasions gnawing by animals etc 2 Check for discolored heat tape insulation If any damage or di...

Страница 19: ...N A93058 32_ F MINIMUM INSTALLED AMBIENT OR FREEZE PROTECTION REQUIRED Fig 19 Winterizing the Furnace To retrieve last code remove 1 of the red main limit wires for 1 to 4 sec until the LED light goes out then reconnect it Do not leave red wire disconnected for longer periods of time as the control will assume an overtemperature condition exists and will respond with blower operation This places t...

Страница 20: ...20 A07822 Fig 20 Wiring Diagram PG9MTAV ...

Страница 21: ...21 A07825 Fig 21 Service Label PG9MTAV ...

Страница 22: ... W Morris St D Indianapolis IN 46231 Printed in U S A Edition Date 04 08 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No SG PG9MTA 02 Replaces SG PG9MTA 01 PG9MTAV ...

Отзывы: