CRISTAL FM 1/2 OVENS Translated manual N°AF220045170-17
26802 Portes Les Valence – France
148
13. CHANGES FOR INSTALLING THE
SQUIRREL CAGE
On a standard oven
Change the standard roof (sheet 1)
a - Disconnect pinion no.2 from shaft no.1
3 screws - 3 nuts - 3 safety washers
Move it from A to B, raising the shaft inside the baking chamber by approx. 70
mm (sheet 2)
lock the 3 screws in the 3 flat collar nuts + nuts + washers
b – Dismantle ball thrust bearing no.3
Assemble the spacer ring onto the yoke (
CHECK THE DIRECTION
)
Reassemble the ball thrust bearing in reverse order.
Modify the standard bottom
Attach the locating pin to the bottom with the HM10x80 screw
Grease the screw and the pin using HT BARRIERTA grease
Assemble the squirrel cage
Adjust the drive disc height
Don't forget to tighten the screw and block it with the safety nut.
Содержание CRISTAL FM1
Страница 122: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 119 26800 Portes Lès Valence France ...
Страница 125: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 26802 Portes Les Valence France 122 P2FOURFM2 2sur2 ...
Страница 128: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 125 26800 Portes Lès Valence France P5FOURFM2 2sur2 ...
Страница 137: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 26802 Portes Les Valence France 134 ELECTRIC CRISTAL M1 M2 ...
Страница 152: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 149 26800 Portes Lès Valence France P520005611 ...
Страница 153: ...CRISTAL FM 1 2 OVENS Translated manual N AF220045170 17 26802 Portes Les Valence France 150 P420005611 ...
Страница 155: ...DEALER S STAMP ...