Introduction
70
SmartNode 4830 DSL Series User Manual
E • Installation checklist
Introduction
This appendix lists the tasks for installing a SmartNode 4830 DSL Series Analog VoIP IAD (see
Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4830 DSL
Series IAD, include a copy of the completed checklist in your site log.
Table 21. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified