Installing the SmartNode extender
30
SmartNode 2290 Series User Manual
3 • Hardware installation
Figure 13. SmartNode extender front panel LEDs and Console port locations (SmartNode 2294 shown)
4.
Verify that the green
Power
LED is lit (see
figure 13
).
Congratulations, you have finished installing the SmartNode extender! Now go to chapter 4,
“Getting started
with the SmartNode”
on page 31.
Console
port
Power
VoIP Link
Enet 0
Link
Run
Enet 0
Activity
Enet 0
100M
Enet 1
Link
Enet 1
100M
Enet 1
Activity
Voice
Port 0/0
Voice
Port 0/1
Voice
Port 0/2
Voice
Port 0/3
Link 100M Activity
0/0
0/1
0/2
0/3
Power
Console
Leased-Line Extender Over IP
SmartNode 2294
Run
Vo
IP
Link
Link 100M Activity
L
in
k 1
0
0
M
A
c
tiv
it
y
0
/0
0
/1
0
/2
0
/3
Enet 0
Po
rts
P
o
w
e
r
Console
Leased-Line Extender Over IP
SmartNode 2294
R
u
n
V
o
IP
L
in
k
L
in
k 1
0
0
M
A
c
tiv
it
y
Enet 1