Planning the installation
33
Model 4520 & 4110 Series Getting Started Guide
3 • Hardware installation
Installation checklist
The installation checklist (see
table 4
) lists the tasks for installing a SmartNode 4520 or 4110 Series router.
Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or
4110 Series router, include a copy of the completed checklist in your site log.
Table 4. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Содержание 4520
Страница 6: ...Contents Model 4520 4110 Series Getting Started Guide 6...
Страница 12: ...About this guide Model 4520 4110 Series Getting Started Guide 12...
Страница 30: ...2 Applications overview Model 4520 4110 Series Getting Started Guide 30 Applications for SmartNode 4520 Series...
Страница 42: ...3 Hardware installation Model 4520 4110 Series Getting Started Guide 42 Installing the gateway router...
Страница 52: ...4 Getting started with the SmartNode Model 4520 4110 Series Getting Started Guide 52 Additional information...
Страница 53: ...53 Chapter 5 LEDs status and monitoring Chapter contents Status LEDs 54...
Страница 80: ...D Port pin outs Model 4520 4110 Series Getting Started Guide 80 FXO port...
Страница 81: ...81 Appendix E SmartNode 4110 Series factory configuration Chapter contents Introduction 82...
Страница 83: ...83 Appendix F SmartNode 4520 Series factory configuration Chapter contents Introduction 84...
Страница 85: ...85 Appendix G Installation checklist Chapter contents Introduction 86...