![Patton electronics 3080/V24 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/patton-electronics/3080-v24/3080-v24_installation-and-operation-manual_4012626010.webp)
3080/V24
124001UA
2-2
I
NSTALLATION
A
ND
O
PERATIONS
M
ANUAL
S
ETUP
& I
NSTALLATION
P
ATTON
E
LECTRONICS
C
O
.
Switch 30 - 1 and 2
OFF
, 3, 4, 5 and 6
ON
Internal Baud Rate = 9600, Normal
Fallback Clock Source = Data Transitions
Fallback Clock = Disabled
Switch 31 - 2 and 3 to
OFF
, 1,4,5 and 6 to
ON
Sync Mode
Contention Mode = Scan
CTS Delay = 1 mS
If the system application requires one or more of the default settings to be changed, it will be
necessary to remove the top cover of the enclosure to access and change the DIP switches
located on the printed circuit board.
Disassembly
Remove the top cover by removing the phillips head screws located on the left and right sides
of the 3080/V24 (CTS DSD-8). DTE/DCE switches SW9 through SW26, interface Jumpers
J4 through J14 and configuration switches SW27 through SW31 are located on the PCB as
indicated on the strapping guide in the Appendix of this manual. After the switch selection
activity is completed,
re-install the top cover BEFORE connecting to a AC power source.
Installation
Select an appropriate location accessible to and within six feet of an AC power outlet, the
outlet must have a ground pin receptacle for product warranty. The DCE-to-DTE cabling
between each attached device and the 3080/V24 (CTS DSD-8) should be “Straight Through”,
shielded and terminated with male connectors. Sub-Channels are marked PORT 1 through
PORT 8, the Master Port is marked, MASTER DCE/DTE. If any terminal has a priority service
mode, ensure it is connected to the port connector designated “PORT 1” on the rear panel of
the 3080/V24 (CTS DSD-8). Secure other terminals or Modems to be serviced to the
remaining “PORT” connectors. Connect the MODEM or TERMINAL to the connector
designated “MASTER DTE/DCE”.
Equipment Grounding (SW27-6)
(default OFF)
Switch SW27-6 provides for grounding interconnection in those systems requiring a
connection between (Frame Ground) and (Signal Ground). Connect ONLY if required.