SWITCH SET S1

The configuration switches on S1 set clock source, RTS/CTS

delay, carrier control, loopback tests.  The default settings are
summarized in Figure 3 (above).  

S1-1 and S1-2:  Clock Source

Switches S1-1 and S1-2 are set in combination to determine the

source of timing for the Model 1090.

S1-1

S1-2

Setting

On

On

Internal

On

Off

Receive recover

Off 

On

External transmit clock

Off

Off

Not a valid setting

NOTE:  When an X.21 QuickConnect™ module is installed in 

one or both base units, one base unit must be configured for 
receive recover clock source.  The particular application will 
dictate which unit must be configured for receive recover clock 

source.

5

S1-3:  RTS/CTS Delay

Switch S1-3 determines the amount of delay between the time RTS

is activated and the 1090 activates the CTS.

S1-3

Function

On 

Short delay (4-9 msec)

Off

Long delay (33-71 msec)

S1-4:  LDL Control

Switch S1-4 determines whether the front panel switch can activate

a Local Digital Loopback (LDL) diagnostic test.

S1-4

Function

On 

LDL Control Enabled

Off

LDL Control Disabled

S1-5:  Carrier Control

The setting for switch S1-5 determines whether the carrier is

“constantly on” or “controlled by RTS”.  This setting allows for operation
in switched carrier or hardware handshaking applications. 

S1-5

Setting

On

Controlled by RTS

Off

Constantly ON

S1-6:  DTE Control of RDL

The setting for switch S1-6 determines whether DTE control of

remote-digital loopback test is enabled or disabled.  If DTE control is
disabled, the RDL test can only be initiated by the front panel switch.

S1-6

Setting

On

DTE control enabled

Off

DTE control disabled

S1-7:  DTE Control of LAL

The setting for switch S1-7 determines whether DTE control of

local analog loopback test is enabled or disabled.  If DTE control is
disabled, the LAL test can only be initiated by the front panel switch.

S1-7

Setting

On

DTE control enabled

Off

DTE control disabled

6

S1 SUMMARY TABLE

Position

Function

Factory Default

S1-1

Clock Source*

On

S1-2

Clock Source*

On 

S1-3

RTS/CTS Delay

On

Short Delay

S1-4

LDL Control

Off

Disabled

S1-5

Carrier Control

Off

Constant

S1-6

DTE Control of RDL

Off

Disabled

S1-7

DTE Control of LAL

Off

Disabled

S1-8

V.54 Enable/Disable

Off

Enabled

*See Note in SWITCH SET S1 (Below) for X.21 Clock Sources

Figure 3. Summary of DIP Switch Default Settings for S1

}

Internal

Содержание 1090

Страница 1: ...like this product and how we can meet your product needs today and in the future Web http www patton com Sales E mail sales patton com Support E mail support patton com Phone Sales 301 975 1000 Phone...

Страница 2: ...designed to provide reasonable protection from such interference in a commercial installation However there is no guarantee that interference will not occur in a particular installation If the Model 1...

Страница 3: ...ndicators Data integrity is enhanced by automatic equalization and gain control The Model 1090 also incorporates transformer isolation and surge protection to guard data and connected equipment agains...

Страница 4: ...r Control The setting for switch S1 5 determines whether the carrier is constantly on or controlled by RTS This setting allows for operation in switched carrier or hardware handshaking applications S1...

Страница 5: ...rface to the serial port and to the power source This section tells you how to make these connections 4 1 CONNECTION TO THE TWISTED PAIR INTERFACE The Model 1090 supports communication between two ter...

Страница 6: ...the two thumbscrews and gently pull the module from the unit Apply equal force to the thumbscrews to keep the module straight during the removal process Installing the New QuickConnect Module 1 Make...

Страница 7: ...d as a DCE Reverse the DCE DTE orientation by pulling the strap out of its socket rotating it 180 then plugging the strap back into the socket You will see that the DCE DTE arrows now point in the opp...

Страница 8: ...odem Green indicates that the remote modem s carrier is being received 13 DTR Will glow green to indicate that the Data Terminal Ready signal from the terminal is active ER Will glow red to indicate t...

Страница 9: ...ment indicates a fault and the Local Analog Loopback test was successful for both Model 1090s you may have a problem with the line between the Model 1090s You should inspect the line for proper connec...

Страница 10: ...e link is in place and that the Model 1090 built in 511 generator and detector are working properly C This test can be done by one operator by first activating the local analog loop or remote digital...

Страница 11: ...ions may cause a reduction in maximum distance obtainable Functionality should not be affected Many environmental factors can affect the maximum distances obtainable at a particular site Use the data...

Страница 12: ...TC Test Control B 21 APPENDIX D 1092 INTERFACE PIN ASSIGNMENT DB 25F Connector DCE Pin Signal 1 FG Frame Ground 2 TD Transmit Data 3 RD Receive Data 4 RTS Request to Send 5 CTS Clear to Send 6 DSR Dat...

Страница 13: ...ntrol A AA TC Test Control B APPENDIX D 1090 INTERFACE PIN ASSIGNMENT DB 25F Connector DCE X 21 Interface Pin Signal 1 FG Frame Ground 2 TD Transmit Data 3 RD Receive Data 4 RTS Request to Send 5 CTS...

Страница 14: ...ta A 3 C Control A 4 R Receive Data A 5 I Indication A 6 S Signal Element Timing A 7 BT Byte Timing A 8 SGND Signal Ground 9 T Transmit Data B 10 C Control B 11 R Receive Data B 12 I Indication B 13 S...

Отзывы: