GB
- 114 -
When installing, never hang the equipment by the discharge line or
by the power cable. The device must be hung up by the provided sus-
pension eyelets.
The pump shaft should be large enough.
5.2 Mains connection
Danger!
The equipment you have purchased comes with an earthing-pin plug.
The equipment is designed for connection to a socket outlet with
earthing contact for 220-240 V~ 50 Hz. Make sure that the socket-
outlet is su
ffi
ciently fused (at least 6 A) and in good working order.
Insert the power plug in the socket-outlet and the equipment is ready
for operation.
Danger!
To rule out danger, this work must be left strictly to a specialist electri-
cian or Customer Service.
6. Operation
You can put the equipment into operation after you have thoroughly
read the installation and operating instructions. Pay attention to the
following points:
•
Check that the discharge line is fitted correctly.
•
Make sure that the electrical connection is 220-240 V~ 50 Hz.
•
Check that the electrical socket-outlet is in good working order.
•
Make sure that no moisture or water can ever reach the power
connection.
•
Lower the pump into the well or shaft using the securing cable.
•
Ensure that the pump is completely under the surface of the water
and approx. 20 cm above the bottom.
•
Make sure that the equipment does not run dry.
•
To switch off the equipment, pull the power plug out of the socket
Anl_PE_TP_1000_N_SPK7.indb 114
Anl_PE_TP_1000_N_SPK7.indb 114
07.04.2022 09:02:55
07.04.2022 09:02:55
Содержание PE-TP 1000 N
Страница 3: ... 3 Anl_PE_TP_1000_N_SPK7 indb 3 Anl_PE_TP_1000_N_SPK7 indb 3 07 04 2022 09 02 50 07 04 2022 09 02 50 ...
Страница 4: ... 4 Anl_PE_TP_1000_N_SPK7 indb 4 Anl_PE_TP_1000_N_SPK7 indb 4 07 04 2022 09 02 50 07 04 2022 09 02 50 ...
Страница 120: ... 120 Anl_PE_TP_1000_N_SPK7 indb 120 Anl_PE_TP_1000_N_SPK7 indb 120 07 04 2022 09 02 56 07 04 2022 09 02 56 ...
Страница 121: ... 121 Anl_PE_TP_1000_N_SPK7 indb 121 Anl_PE_TP_1000_N_SPK7 indb 121 07 04 2022 09 02 56 07 04 2022 09 02 56 ...