6
Schedule 80 6” (6-5/8” OD)
42” Mast Steel Pipe
18”x18”x1/2” Base Plate
with 14” Centered Holes
Reinforced Steel Angles for Support
The Optional Kit Includes:
Bolt and Template Kit with Pipe
(On one skid) = 215 Lbs.
Note: See Foundation Requirements
& Specifications on previous page.
Mast Pipe(optional)
with Bolt & Template Kit
6 5/8” O.D.
Steel Pipe
4 Anchor Bolts
1 1/4” Diam.
#4 Rebar in all concrete
pad surfaces
Base Plate
18”x18”x1/2”
4 Typ 1 1/4”
Diam.x24”
42”
A
C
REMAINING 4 NUTS AND WASHERS
ARE USED TO SECURE MOUNT TO
FOUNDATION PAD
REMOVED AFTER
CONCRETE CURES
B
42” Above Support
gussets