Shaking Tower Kit
ME
-
7018
5
012
-
16515A
Ground Floor Construction
Items Needed for the Ground Floor
1. Attach the four #2 I-Beams to the
Flat Round Connector using
Truss Set Screws.
2. Attach the four Full Round Con
-
nectors to the four #2 I-Beams as
shown.
3. Attach the four #3 I-Beams to the
Full Round Connectors as
shown.
4. Align a Flat F4 Beam and a Truss
Set Screw with the top vertical
slot on a Full Round Connector.
Attach the beam using the Truss
Set Screw.
5. Repeat the process to attach the
other Flat F4 Beams to the other
Full Round Connectors using
Truss Set Screws.
#3 I-Beams (4)
Flat Round Connector (1)
Flat F4 Beams (4)
#2 I-Beams (4)
Full Round Connectors (4)
Truss Set Screws (20)
#3 I-Beam
#3 I-Beam
#3 I-Beam
#3 I-Beam
#2
Flat Round Connector
Truss Set Screw
Full Round Connector
#2
#2
Top Vertical Slot
Top
Vertical
Slot
Ground Floor
Structure
Full Round Connector
Truss Set
Screw
Flat F4
Beam
Ground Floor Structure
with Four Flat F4 Beams