®
45
M o d e l N o . M E - 6 9 9 2 B
D o u b l e T i e d A r c h B r i d g e w i t h F l e x i b l e I - B e a m s
Double Tied Arch Bridge with Flexible I-Beams
#3
#3
#5
#4
F4
Use a Flat Connector and four #2 I-Beams
for the platform for the slotted masses.
Half
Round
#3
#2
#3
3X4
#3
#4
Flex 4
Flex 3
AC = Angle Connector
SC = Straight Connector
CTC = Cord Tensioning Clip
AC
AC
#1
Flex 5
Sliding Connector
SC
#4
#3
#3
#4
F4
F4
#4
#3
3X4
Flex 4
#2
Full
round
CTC
#2
#4
Flex 4
Flex 4
Flex 4
Flex 4
Flex 5
Flex 5
Flex 4
Slotted masses
(not included)
Flex 4
Flex 4
Flex 4
Flex 4
3X4
SC
Sliding Connector
Flex 5
#1
#1
#1
CTC
CTC
#2
#2
#2
#3
#3
#1
CTC
CTC
CTC
#4
CTC
CTC
#1
AC
CTC
Tie one end of
the cord
through the
hole in the
beam
The cord goes
between the
Sliding Connector
and the I-Beam
Sliding Connector
#1