13
GB
IE
NI
Installation manual
Unpacking
Carefully unpack the garden shredder box
and check that it is complete. Dispose of the
packaging material correctly.
1. Remove the shredder from the
packaging.
2. Pull the collector box (17) out of the
chassis (16) and take out the shredder
unit (15) and accessories.
3. Check the scope of delivery.
Assembling the shredder
(1) Mount the support feet (3) on
the chassis leg. Fasten with self-
cutting Screws 5 x 45 mm
(2) Assemble the wheel axle (21)
through the holes in the base
frame (16) and fix it by outer
washer (18) and cotter pins.
(3) Place the two wheels (2) on the
wheel axle (21), place the outer
washers (19) and secure the split
pins (20).
(4) Fit the wheel covers (1) with a
audible click on the wheels (2).
(5) Mount the Chopper unit (15)
with a Phillips screwdriver (not
included in delivery) with the four
enclosed Screws on base frame
(16).
(6) To insert the the collecting
container (17) Unlock the safety
switch (4), by pushing into
the "OFF" position. Push the
collecting container (17) in the
base frame (16). The collecting
tray (17) can only be placed in
one direction.
(7) Safe the Collecting container (17)
by pulling the safety switch (4)
into the "ON" position.
Power-On indicator
The Power-On indicator (13) will light when
all three following conditions are met:
1. Collector box (17) and safety switch (4)
are in proper position
2. The device is connected to the mains
supply
3. The overload protection has not been
triggered. (See respective section.)
The device will not operate while the Power-
On indicator (13) is off.
Operation
Start-up
Before starting the shredder, make sure that
the shredder unit (15) is firmly attached to
the chassis (16) and the collector box (17)
and safety switch (4) are in their proper
positions.
The shredder cannot be switched
on before the collector box (17) and
safety switch (4) are in their proper
positions.
Switching the shredder on and
off
Make sure that the mains power
voltage agrees with the type plate
on the shredder.
1. Connect the power cable (6) to a
suitable power outlet. Check that the
Power-On indicator (13) turns on.
2. Check that the funnel feeder (8) is
empty.
3. To switch on in continuous mode
for shredding, press the function
switch (9) downwards. Then,
E
D
B
C
F