PDKS 6.3 B3
GB
│
IE
│
NI
│
17
■
The following options are available:
♦
Attach a maintenance unit with an oiler to the compressor .
♦
Install a fitted oiler into the compressed-air line or the compressor .
♦
Add 3–5 drops of pneumatic oil into the connector nipple
every 15 minutes of operation .
Connecting to a compressed-air source
NOTE
►
Before connecting the compressed-air source
–
the correct working pressure (3–6 .3 bar) must be fully
reached, and
–
you must ensure that the trigger is in its initial position .
♦
Attach the tool to a compressor by connecting the connector
nipple with the supply hose of the compressed-air source .
♦
The compressed-air source must be equipped with a pressure
reducer so that you can regulate the air pressure .
Содержание PDKS 6.3 B3
Страница 3: ...6x...
Страница 29: ...PDKS 6 3 B3 26 GB IE NI...