8-76 Periodic Maintenance and Adjustment
①
Jumper cable positive pole
②
Jumper cable negative pole
5.Connect jumper cable negative pole to the original battery negative pole.The other end of the
jumper cable will be connected to the vehicle medal cover that not paint.
6.Start the engine.
(
Reference to “the cold engine start” content in this manual
)
7.When the engine started, disconnect the jumper cable and the replaced battery negative pole,
disconnect the replaced battery and the original battery negative pole.
8. Mount the battery cover.
Close the engine hood.
Содержание HS100ATV
Страница 1: ...Owner s Manual...
Страница 12: ...1 12 Location of the Warning and Safety Labels...
Страница 13: ...1 13 Location of the Warning and Safety Labels...
Страница 14: ...1 14 Location of the Warning and Safety Labels...
Страница 15: ...1 15 Location of the Warning and Safety Labels FOR Sport model...
Страница 17: ...1 17 Location of the Warning and Safety Labels...
Страница 18: ...2 18 Safety Information...
Страница 19: ...2 19 Safety Information...
Страница 26: ...2 26 Safety Information...
Страница 35: ...3 35 Description and Vehicle Identification...
Страница 53: ...Pre Operation Check List 5 53 Shift lever...
Страница 56: ...Pre Operation Check List 5 56 Standard position B A Minimum E Maximum Specified spanner...
Страница 59: ...Pre Operation Check List 5 59 2...
Страница 70: ...8 70 Periodic Maintenance and Adjustment a tire change rules...
Страница 84: ...8 84 Periodic Maintenance and Adjustment 1 Stop the vehicle with brake applied 2 Shut down the engine...
Страница 99: ...8 99 Periodic Maintenance and Adjustment authorized ATV dealer...
Страница 138: ...8 138 Periodic Maintenance and Adjustment Cap of rear part of headlight 3 Tear up Bulb Holder of Headlight...
Страница 146: ...8 146 Periodic Maintenance and Adjustment...