PF6000X
Barrier Maintenance
As stated at the beginning of this manual we recommend a bi-annual service, but at a bare minimum, it is imperative
that you get a service done once every 12 months. This is not a sales tactic in disguise, there is a very serious
health and safety issue/risk associated with not complying to this. Also in order for your barrier to keep complying
with the appropriate legislation.
Ÿ
Before carrying out any maintenance to the installation, disconnect the mains power supply.
Ÿ
Ÿ
Make sure you have disconnected/Isolated the power before attempting any work.
Ÿ
Ÿ
A Maintenance Contract should be sought from a specialist company after a maximum of 5000 manoeuvres or 1year from
the install date.
Ÿ
Ÿ
Occasionally clean the photocell optical components and make sure they are free from dirt, water, rain, soil etc. B atteries
in photo cells may need to be changed every 6 months or sooner dependant on use. Barrier will not work properly without
photo cell function.
Ÿ
Ÿ
Have a qualified technician (installer) check the correct setting of the electric clutch.
Ÿ
Ÿ
If the power supply cable is damaged, it must be replaced by the manufacturer or its technical assistance service, or else by
a suitably qualified person, in order to prevent any risk.
Ÿ
Ÿ
When any operational malfunction is found, and not resolved, disconnect the mains power supply and request the
assistance of a qualified technician (installer). When automation is out of order, activate the manual release to allow the
opening and closing operations to be carried out manually.
Ÿ
Gearbox drive unit is “sealed” for life and requires no further lubrication.
Date of Visit:
Customer:
Site Address:
Postcode:
Contact:
Contact Number:
Check safety device and equipment
Ensure ground anchor is stable and secure
Check all electrical connections
Check motor and fixings
Check pole arm adaptor and fixings
Check pole for damage and signs of stress
Check end rest is secure and functional
Check reader post is securely fixed and cold holder, etc are functioning
Check for visual damage
Check and tighten all nuts and bolts
Check limit switches
Check any external controls (if our system)
Check and grease rod ends
Check pole fixings
Check barrier skirt and fixings
Check and lubricate as necessary
Check and grease all bearings
Test door switch operation is functioning
Check and level pole arm, if required
Check automated operation of barrier open and close
Check manual operation open and close
Clean and wipe barrier
Fill out service log in manual
Fit next service due sticker and service phone number sticker
BARRIER 1 - Entry
No:
MAINTENANCE JOB SHEET
Check safety device and equipment
Ensure ground anchor is stable and secure
Check all electrical connections
Check motor and fixings
Check pole arm adaptor and fixings
Check pole for damage and signs of stress
Check end rest is secure and functional
Check reader post is securely fixed and cold holder, etc are functioning
Check for visual damage
Check and tighten all nuts and bolts
Check limit switches
Check any external controls (if our system)
Check and grease rod ends
Check pole fixings
Check barrier skirt and fixings
Check and lubricate as necessary
Check and grease all bearings
Test door switch operation is functioning
Check and level pole arm, if required
Check automated operation of barrier open and close
Check manual operation open and close
Clean and wipe barrier
Fill out service log in manual
Fit next service due sticker and service phone number sticker
BARRIER 1 - Exit
Содержание PF6000X
Страница 1: ...PF6000X Automatic Barrier Rev 1 0 Installation Operation Maintenance Manual ...
Страница 11: ...PF6000X Handing Change Procedure ...
Страница 12: ...PF6000X Handing Change Procedure ...
Страница 13: ...PF6000X Handing Change Procedure ...
Страница 14: ...PF6000X Barrier Manual Release Procedure ...
Страница 15: ...PF6000X Straining Wire Assembly ...
Страница 23: ...PF6000X Loop Detector Guide Relay Functionality Diagnostics ...
Страница 28: ...PF6000X Safety Edge Setup ...
Страница 29: ...PF6000X Safety Edge Setup ...