Handover Check list 

 

The following items have been explained to the client: 

[tick] 

✓ 

 

How to operate the barrier. 

 

How to isolate the power to the barrier. 

 

How to manually release the barrier. 

 

How the safety features of the barrier work. 

 

How to avoid any residual hazards associated with the barrier. 

 

How to use the activation devices. 

 

How to change the batteries on remotes etc. 

 

How to change the keypad pin code. 

 

How and when to perform the required safety checks. 

 

Other [insert] 

The following items have been passed to the client. 

 

Manual release instructions. 

 

Intercom user manual. 

 

Declaration of Conformity. 

 

User warnings and residual hazard identification. 

 

Planned Preventative Maintenance instructions. 

 

Maintenance log. 

 

Other [

insert

 

Installer Name: 

Date: 

 
 

Signature: 

 
 

Client Name: 

Date: 

 
 

Signature: 

Содержание PF6000

Страница 1: ...Automatic Barrier Operation and Maintenance Manual Revision 10 5 2019 THIS DOCUMENT CONTAINS IMPORTANT INFORMATION IT MUST BE KEPT WITH THE BARRIER AT ALL TIMES...

Страница 2: ...e force limitation as required and specified in BS EN12978 2000 unfortunately this cannot be achieved when under lattice or security hi bar lattice is installed retro fitted to the barrier beam It is...

Страница 3: ...hly accelerate to full speed until the intermediate limit is reached at which point the barrier will decelerate for the remainder of the travel distance If a safety device is activated i e safety edge...

Страница 4: ...this allows access to the manual release This is located on the side panel of the barrier Please note On removal of the correct screw this will activate a safety switch which will stop the barrier mov...

Страница 5: ...safety sensors Keep the photo electric beam covers clean Make sure pedestrian routes which are Cleary marked are always accessible Safety checks These user safety checks should be conducted every few...

Страница 6: ...ined in a safe condition If the premises are also a workplace there are specific duties under regulation 5 and 18 of the Workplace Health and Safety and Welfare Regulations 1992 Failure to meet duties...

Страница 7: ...ternal and external Sealing of photocell covers and cable entry Wire terminations in control panel Sealing of control unit cover and cable entries Condition of all wiring and junction boxes Function o...

Страница 8: ...h the barrier How to use the activation devices How to change the batteries on remotes etc How to change the keypad pin code How and when to perform the required safety checks Other insert The followi...

Страница 9: ...unit Control panel Feig TST FUZ PFL2 B Limit Switches Schneider XCKN2118P20 Limit Switch Door Manual Release Safety Switch Schneider XCMN21FOL2 Safety Door Switch Loop Detector Feig SUVEK1A Single SUV...

Страница 10: ...k done Company PPM Name Reactive Signature Date Work done Company PPM Name Reactive Signature Date Work done Company PPM Name Reactive Signature Date Work done Company PPM Name Reactive Signature Date...

Страница 11: ...Address Tel Email Web Insert Trade Partner Name Here...

Страница 12: ...Address Tel Email Web Engineers Section Not For End Users Control Panel Overview...

Страница 13: ...Address Tel Email Web...

Страница 14: ...Address Tel Email Web...

Страница 15: ...Address Tel Email Web...

Страница 16: ...Address Tel Email Web...

Страница 17: ...Address Tel Email Web...

Страница 18: ...Address Tel Email Web...

Страница 19: ...Address Tel Email Web...

Страница 20: ...Address Tel Email Web...

Страница 21: ...Address Tel Email Web...

Страница 22: ...Address Tel Email Web...

Страница 23: ...Address Tel Email Web...

Страница 24: ...Address Tel Email Web...

Отзывы: