Parker AEGCTM-2 Скачать руководство пользователя страница 10

10

Parker Autoclave Engineers

Instrumentation Products Division
Erie, PA  USA
www.autoclave.com   |   Cat. 02-9221ME

 

Note:

 Plug or cap the free end of tubing not being coned 

or threaded to prevent cutiing oil from spilling onto the 

ground.

5.16  Close the die head by pulling the two handles on the die 

head trip yoke away from the motor.

5.17  Turn the machine on. Ensure the chasers are thoroughly 

lubricated by the cutting oil.

5.18  Carefully slide the collet assembly with mounted tube 

forward until the cone of the tube touches the chasers.

5.19  Squeeze the two handles on each side of the trip yoke 

and collet assembly together to feed the tube into the 

chasers until you see the threads being cut. Once all four 

die chasers are cutting, let go of the handles and the die 

head will self-feed.

5.20  When preset length has been threaded, the trip yoke is 

actuated and will automatically open the die head.

5.21  Turn off the machine and clean the chips out of the die 

head assembly to prevent damage when the yoke  

assembly is pulled away from the die head. Pull collet 

assembly away from die head.

5.22  Loosen the collet nuts and remove tube. Allow any oil 

inside the tubing to drain back into the machine.

 

Note: 

The coning and threading machine is furnished 

with a lubrication pump. This is used to supply cutting 

fluid to the points of cone cutting and threading. A 

 

sufficient supply of cutting fluid shall be maintained 

 

during machining operations for successful coning and  

threading. 

 

Note:

 An optional thermostatically controlled immer-

sion heater is available for use in cold weather. Cutting 

fluid should be Prestige 1246LV (AE Part No. P-8699) or 

equivalent. 

5.23 

To Remove Chasers

 

5.23.1 

Trip die head into open position.

 

If the die head is in the closed position, push on trip  

 

yoke arms toward the motor causing head to trip into    

open position.

5.23.2 

Move die head to extreme open position.

 

You may have to start and stop the machine quickly  

 

to get the die head to stop spinning in a good posi- 

 

tion to have access to the head release lever.

 

      CAUTION:

 

Unplug the machine before proceeding.

 

Next, press head release lever in (located on adjusting 

ring) with an implement, such as a screwdriver, to allow 

the die head to spring back into extreme open position. 

The die chaser slots are now fully exposed with the die 

head in this position (Figure 8).

5.23.3 

Remove chasers.

 

Place a clean cloth or pad against the bladed portion of 

the chaser, then push the chaser outward until it pops 

loose. Chaser spring plungers prevent chasers, before 

removal, from falling into chips and oil.

 

 

Note

: Chaser removal is done without removing the die 

head from the machine.

Section 6.0  

Assembly and Make Up of Coned Connection

 

After coning and threading operations, use Figure 12 and Table 4 

for properly connecting and torquing coned connections.  

Gland

Tubing

Collar

Figure 12 

Assembly and Make up of Connection

Step 1

 Slip gland onto tubing as shown and thread collar on  

tubing until one (1) to two (2) threads are exposed be-

tween collar and cone.

Step 2

 Insert tubing into connection, engage gland and tighten 

“finger-tight”.

Step 3

 Tighten gland to specified torque.

!

Содержание AEGCTM-2

Страница 1: ...MODELS AEGCTM 2 AEGCTM 2G AEGCTM 2E CE AEGCTM 2E CEG AEGCTM 2WOH AEGCTM 2EWOH CE Coning and Threading Machine Operation and Maintenance Manual Catalog 02 9221ME April 2014 ...

Страница 2: ...onnection 10 13 Completed Medium Pressure Connection 11 14 Completed High Pressure Connection 11 15 View of Pump Face 13 16 Pump Reservoir Assembly 13 TABLES 1 Extra Cutting Allowances for Engagement 4 2 Required Feedwheel Rotation for Coning Operation 6 3 Tube Thread Dimensions 7 4 Torque Requirements for Coned Connection 11 5 Tooling Part Number 12 Drawings and Schematics Sheet 1 AEGCTM 2 115 VA...

Страница 3: ... covers must be in place at all times and are only to be removed by qualified service personnel with the power cord disconnected 1 6 Operating personnel shall wear eye protection at all times while operating this machine 1 7 When changing tooling or servicing the machine unplug the power cord In the event that either the motor or the pump become stalled unplug the power cord immedi ately to avoid ...

Страница 4: ...gure 2 Determine Tube Length Fitting to Fitting Distance Fitting to Fitting Distance 2 x Extra Allowance from Table 1 2 x 1 16 Finish Allowance Cut Length Table 1 Extra Cutting Allowance for Engagement Connection Tubing Size Type OD x ID Engagement Allowances in mm SF250CX 1 4 x 109 55 14 0 SF375CX 3 8 x 203 69 17 6 SF562CX 9 16 x 312 84 21 3 SF562CX 9 16 x 359 84 21 3 SF750CX 3 4 x 438 1 00 25 4 ...

Страница 5: ...collet on a hard surface and place the collet nut over the large end of the collet as shown and push together They should snap together 4 15 To separate a collet from the collet nut grip the collet nut in one hand and pull firmly sideways on the small end of the collet to twist it out of the collet nut 4 16 Install the collet assembly into the holder 4 17 Install the collet and collet nuts for the...

Страница 6: ...which is perpendicular to the center line of the tubing The critical finish for coned connections is on the leading edge of the cone The transition point where the cone meets the square end of the tube must be free of burrs and tool marks Figure 7 4 22 Reverse the feedwheel until the tubing is disengaged from the cutting blades Attach the chained hook to the feedwheel and if no one is using the th...

Страница 7: ... 0 Threading Operation Install Collets and Die Chasers 5 1 Select the appropriate sized collet and die chasers using Table 5 and tube size Install collets as described in Install Collet Section steps 4 12 through 4 17 5 2 Set the locks on the cart s wheels 5 3 Install die chasers in die head Note The die head has three positions closed open and extreme open position When the die head is in the clo...

Страница 8: ...ext to the adjusting ring binding screw and use the tool to rotate the adjusting ring until the desired pitch diameter is obtained The die head adjusting ring is marked with an S smaller pitch diameter and an L larger pitch diameter to indicate the direction to turn the ring to adjust the pitch diameter smaller or larger Figure 9 5 4 4 Tighten adjusting ring binding screw before cutting a thread 5...

Страница 9: ...embly against the spacer head which in turn will push against the trip yoke causing it to automatically open the die head and release the tubing 5 10 Turn off the machine and clean the chips out of the die head assembly to prevent damage when the yoke assem bly is pulled away from the die head Pull collet assembly with tube mounted in it away from die head 5 11 Loosen the collet nuts and remove tu...

Страница 10: ... and threading Note An optional thermostatically controlled immer sion heater is available for use in cold weather Cutting fluid should be Prestige 1246LV AE Part No P 8699 or equivalent 5 23 To Remove Chasers 5 23 1 Trip die head into open position If the die head is in the closed position push on trip yoke arms toward the motor causing head to trip into open position 5 23 2 Move die head to extr...

Страница 11: ...X10 15 16 55 74 6 40 54 4 SF562CX20 15 16 55 74 6 40 54 4 SF750CX10 1 13 16 75 101 6 55 74 6 SF750CX20 1 13 16 90 122 0 70 95 0 SF1000CX10 1 3 8 125 169 5 100 135 6 SF1000CX20 1 3 8 125 169 5 100 135 6 SF1500CX 1 7 8 200 271 2 160 217 0 F250C 5 8 25 33 9 100F250C 5 8 50 67 8 F312C150 3 4 70 94 9 F375C 13 16 50 67 8 100F375C 5 8 105 142 8 F562C 1 3 16 75 101 6 F562C40 1 3 16 60 81 4 SF1000C30 1 3 8...

Страница 12: ...chasers Note See the Drawings and Schematic section for information on additional parts not required as spare parts 7 1 Drive Belt for the AEGCTM 2E CE p n P 6958 1 for the AEGCTM 2 p n P 1754 2 7 2 Coning Blade Holder p n 201D 0159 7 3 Coning Threading DVD p n P 9930 D 7 4 Coning Threading Gage 7 5 Other Tooling See Table 5 7 6 Cutting Oil p n P 8699 Section 8 0 Service For service contact the Pa...

Страница 13: ...e impeller by hand to make sure it turns freely While keeping the impeller from touching any thing plug the unit in to see if the impeller will turn 6 If it does re install the volute three 3 screws and inlet screen IF FOR ANY REASON THESE OPERATIONS DO NOT RESTORE THE PUMP TO FULL SERVICE CONTACT THE LITTLE GIANT PUMP COMPANY OR IT S AUTHORIZED SERVICE CENTER DO NOT IN ANY CASE OPEN THE SEALED PO...

Страница 14: ...14 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 15: ...15 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 16: ...16 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 17: ...17 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 18: ...18 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 19: ...19 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 20: ...toclave com Cat 02 9221ME OIL SPLASH GUARD PARTS LIST KIT PART NUMBER AEGCTM 2GK Item No DESCRIPTION PART NUMBER QTY 1 Oil Guard 90598 1 2 Screw 90596 2 3 Lockwasher Spring 1 4 Regular P 3701 2 4 Bracket Oil Guard 191F 3394 1 5 Screw 90597 2 6 Lockwasher Spring 5 16 Regular P 0841 2 ...

Страница 21: ...21 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 22: ...22 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 23: ...23 Parker Autoclave Engineers Instrumentation Products Division Erie PA USA www autoclave com Cat 02 9221ME ...

Страница 24: ...ible for making the final selection of the system and components and assuring that all performance endurance maintenance safety and warning requirements of the application are met The user must analyze all aspects of the application follow applicable industry standards and follow the information concerning the product in the current product catalog and in any other materials provided from Parker o...

Отзывы: