15
2. Insert the bottom end of the rear
stands into the connecting pipe and line
up the holes. Insert the M8x45 bolts each
with a arc washer through the holes
from one side, the secure with arc
washer and nuts from the other side.
3. Insert the wheel shaft on each side,
and then put on the wheels.
Secure them each with a circlip, then put
on the wheel covers.
4. Insert the up end of the support legs
into the support frame tube, line up the
holes and secure them with M8x45 bolts
with arc washers and nuts.
OPERATION
OPERATION
OPERATION
OPERATION
Use two M8x50 bolts fix the machine on
level ground before operating the log
splitter.
Содержание DT-814175
Страница 14: ...13 SKEMA OVER DELE SKEMA OVER DELE SKEMA OVER DELE SKEMA OVER DELE...
Страница 29: ...13 SCHEMA VER DELAR SCHEMA VER DELAR SCHEMA VER DELAR SCHEMA VER DELAR...
Страница 44: ...13 OSAT...
Страница 51: ...5 stored or transported under ambient temperatures between 25 o C and 55 o C...
Страница 59: ...13 PARTS SCHEMATIC PARTS SCHEMATIC PARTS SCHEMATIC PARTS SCHEMATIC...
Страница 63: ......