Park House Healthcare Delta Plus Скачать руководство пользователя страница 14

                         

 

 

 

13

 

T5  Replacing the compressor 

Check 
1.  Turn on the AC power and check the air flow is above 8 lpm and the pressure is 

above 150 mmHg 

2.  If the compressor fails to meet the air flow or pressures stated, please replace 

the compressor 

 

Procedure 
1.  Remove both the air tubing and wiring connecting to the compressor 
2.  Remove both pump wiring leads from the control panel PCB 
3.  Use appropriate tools to unscrew “U-Shape compressor bracket” by twisting 

open the screw washer 

4.  Pull out the compressor rubber tips from the U-Shape bracket, each 

compressor has total of 8 dampening tips 

5.  Inset new compressor assembly 
6.  Rubber tips must insert and pass through the U-Shape bracket to ensure 

proper suspension, refer to diagram 5_1 

7.  Secure the finished compressor assembly, including washer, back to the 

enclosure base 

8.  Re-connect the compressor lead wires and tubing back to original position 
 

 

 

 

 

Содержание Delta Plus

Страница 1: ...DELTA PLUS Bariatric Mattress Replacement System Service Manual...

Страница 2: ...STRUCTION 5 4 ALL PARTS ILLUSTRATION 6 5 OPERATING TROUBLESHOOTING SERVICE OVERVIEW 5 1 Service checklist 7 5 2 Service repair procedures 8 6 PUMP ASSEMBLY 6 1 Pump exploded view Diagram 1 16 6 2 Base...

Страница 3: ...2 1 Product View Illustration 1 1 Front View Side View I Side panel assembly Front View Control panel 1 2 Side View...

Страница 4: ...3 Side View II Air outlet quick connector assembly 1 2 Rear View Rear View Pump hanger 2sets Air intake filter Enclosure screws x 6 Brief Operating Instructions...

Страница 5: ...4 2 Brief Operating Instructions...

Страница 6: ...tected prior to repair Attention Before commencing the repair please check the following CPR is fastened securely See Fig A For all the required replacement parts please contact Park House Healthcare...

Страница 7: ...6 4 Internal Parts Illustration...

Страница 8: ...T2 Check the control panel power switch fuses and compressor assembly Solution Replace the fuse T3 Solution Replace the power switch T2 Solution Replace the compressor T5 Compressor is not functionin...

Страница 9: ...he timer and control panel Solution Replace the timer T6 Mattress unable to lower the air pressure Solution Replace the control panel T1 Conduct a pump pressure test T7 Incorrect pressure detected Sol...

Страница 10: ...he connection of both power and control panel terminals is tight if any disconnected terminals are found refer to diagram 4 for instructions on how to reconnect 1 Remove the control panel from the PCB...

Страница 11: ...e then replace with a new power switch Procedure 1 Remove the side panel assembly 2 Remove the power switch wiring terminals 3 Remove the power switch by squeezing and pressing forward 4 Replace with...

Страница 12: ...new fuse if damaged Procedure 1 Remove the fuses with appropriate tooling 2 Replace with the new fuses 3 Use an appropriate screwdriver to screw the fuses back into the side panel assembly 4 Before s...

Страница 13: ...the unit The blacker the filter material the dirtier the filter is Procedure 1 Remove the air filter cap from the pump enclosure 2 Remove the air filter from the enclosure 3 Insert new air filter unit...

Страница 14: ...s from the control panel PCB 3 Use appropriate tools to unscrew U Shape compressor bracket by twisting open the screw washer 4 Pull out the compressor rubber tips from the U Shape bracket each compres...

Страница 15: ...tes the pointing arrow found at the air chamber plate will touch the micro switch as OPEN position If untouched it is short circuit and the multi meter will sound off 3 3 If the timing motor does not...

Страница 16: ...LED light will light up when the correct pressure is reached 5 Check that the pressure has reached the required level 6 If an incorrect pressure is detected follow the problem checklist below A Leaks...

Страница 17: ...16 6 Pump assembly 6 1 Pump exploded view diagram Diagram 1...

Страница 18: ...17 6 2 Base exploded view diagram Diagram 2...

Страница 19: ...18 6 3 Side panel assembly exploded diagram Diagram 3...

Страница 20: ...19 6 4 Control panel PCB diagram Diagram 4...

Страница 21: ...ch 07 F376A01 0000 Air Connector assembly 08 371001 0000 Case 09 F375B07 0000 Silicone tubing assembly 10 F375B08 0000 Silicone tubing assembly 11 F375B12 0000 Silicone tubing assembly 12 F375B09 0000...

Страница 22: ...nd the country Park House Healthcare is a respected member of the British Healthcare Trade Association and has BS EN ISO9001 2000 and EN46002 accreditation which is the specific quality standard for M...

Отзывы: