15
If you don’t lower the pool water level to winterize:
1. Remove the return guard, weir
door, debris basket, venturi
nozzle, and ozone delivery tube
if so equipped. Store items in a
safe place.
2. If so equipped, disconnect
the ozone tubing from the
standpipe at the equipment
pad and blow the ozone line to
the skimmer. Plug the hole in
the skimmer with ¼” NPT plug.
3. Select correct size plug for line
to be winterized. Available 1½”
or 2”.
4. The plug includes an o-ring seal
and is wrapped with Teflon
tape for ease of assembly and
removal, thread into socket
hand tight then use a wrench to
tighten ½ to 1 additional turn.
5. The cap, washer and foam
may be removed to use a
plug wrench like Paramount
#004252547600.
6. After the plug is tightened
remove the cap and blow the line from the other end.
7. Pour some antifreeze down the pipe and into the skimmer for added freeze protection.
8. Slide foam, washer and cap on freeze stack to seal. DO NOT GLUE the cap to the stack.
9. The 1½” version includes a length of foam to be used in the return pipe of a venturi skimmer.
10. The center pipe and foam of the freeze stack may be cut if it is too tall to put the deck access
cover back on.
11. Cover the skimmer to prevent rainwater or snow accumulation.
Additional methods may also be required. Refer to the ParaskimV
manual. There are many methods to winterizing a pool and pool
equipment. Different methods are used depending on regional
conditions. It is the pool operator’s responsibility to ensure all components of the pool and pool
equipment are protected from the most severe freeze conditions in their specific area.
NOTICE
If you lower the pool water level below the skimmer to winterize:
1. Lower the pool water level below the skimmer opening.
2. Remove the return guard, weir door, debris basket, venturi nozzle, and ozone delivery tube if so
equipped. Store items in a safe place.
3. OPTIONAL: On the pool side of the venturi discharge install the optional Paramount O-ring plug
(004-702-9970-00) into the fitting. Alternately you may use a 2 ¾” rubber plug.
4. Vacuum all water from the skimmer.
5. Disconnect the ozone tubing from the standpipe at the equipment pad and blow the ozone line to
the skimmer. Plug the hole in the skimmer with ¼” NPT plug.
6. Select correct size plug for line to be winterized. Available 1½” or 2”.
7. The plug includes an o-ring seal and is wrapped with Teflon tape for ease of assembly and removal,
thread into socket hand tight then use a wrench to tighten ½ to 1 additional turn.
8. The cap, washer and foam may be removed to use a plug wrench like Paramount #004252547600.
9. After the plug is tightened remove the cap and blow the line from the other end.
10. Vacuum all water from the skimmer.
FOAM
1½"
2"
2½"
FREEZE
STACK
PLUGS
Plug wrench
#004252547600
Freeze stack
with 1½" NPT plug
#004252561500
Freeze stack
with ½" NPT plug
#004252474500
Freeze stack
with 2" NPT plug
#004252164500
Replacement
Foam Tube
#004252562000
Continued
Содержание Paraskim V
Страница 20: ...20...