
6
PRE-PLASTER DETAIL | RIBBED BODY INSTALLATION
1. Make a cutout or opening approximately 1”
deep and 1” bigger than the pipe.
This cutout will be filled with plaster or other
finish coat to create a water stop.
2. Cut off riser pipes flush with concrete surface.
3. Remove cap. Prime the inside of the pipe.
DO NOT PRIME THE BODY.
DO NOT ROTATE THE BODY IN THE
PIPE.
4. Glue the body into the pipe with a HEAVY
BODY PVC SOLVENT CEMENT.
The glue must cover the full length of the body
barrel and 3” deep inside the riser pipe. Push
the body into the pipe until the shoulder hits
the top edge of the pipe.
Let fumes vent for 30 minutes then replace all
body caps.
5. PLASTERING THE POOL
Leave all plaster caps in place for removal at
start up.
NOTE: Optional, the plaster crew may remove
the plaster caps as they finish.
NOTE: The body does not come with the nozzle
installed.
NOTICE: HEAVY BODY GLUE IS REQUIRED