10
For technical assistance call 1.800.621.5886 or contact your regional representative
MAKING PLUMBING CONNECTIONS
1.
Turn off power to the filtration
system pump at the circuit
breaker.
2.
Pump strainer pot
installation: (Fig. 10)
2.1 Check pump elevation
above water level. Refer to
(Chart 1) for proper check
valve selection. The 0.5 lb
valve comes standard with
Clear O3
®
and others are
available to order
seperately.
2.2 Remove strainer pot plug. If
there is an O-Ring on plug
take O-Ring off of pot plug
and slide over threaded end
of check valve.
2.3 Wrap the check valve four
times with teflon tape and
install into the strainer pot
plug-hole. Add more tape
if valve does not seal.
(Fig. 11)
Fig. 10
Fig. 11
Chart 1
Pump Elevation Above
Water Level
Check Valve
Rating
Part Numbers
1’ (30cm)
0.5 lb
005-402-1250-00
2’ (60cm)
1.5 lb
005-402-2502-00
4’ (120cm)
3.0 lb
005-401-2503-00
5’ (150cm)
4.0 lb
005-401-2504-00