4. Troubleshooting

Table 4–6. PSTN Module Troubleshooting

Symptom

Probable Causes

Corrective Action

No indicators are lit on 
the T1/STS-1 module.

CPX is not powered.

Put the suspect card on standby, 
locked, resources removed. Then 
switch it out (see 

Hot Swapping Line 

Cards 

on page 

5-11

)

Verify that the CPX is receiving –48 
VDC from the plant battery.

Software error occurred 
on the CP module, 
preventing the T1/STS-1 
module from initializing.

Power down the CPX, then reapply 
power by turning its circuit breaker 
switch off, then on again 
(see 

Figure 4–2 

on page 

4-12

).

T1/STS-1 module is 
faulty.

Replace the module (see 

Module 

Troubleshooting 

on page 

4-6

)

FAIL

 indicators are lit 

and/or 

RUN

 indicators 

are off on all T1 
modules in the CPX.

Software error occurred 
on the CP module, 
causing the T1 modules to 
initialize improperly.

1. Turn the CPX rear circuit breaker 

switch off, then on again.

2. After the system initializes, verify 

that all T1 module 

FAIL

 indicators 

are off and 

RUN

 indicators are lit.

CP module is faulty.

Switch over CP to standby. If required, 
swap out (see 

Hot Swapping CP and 

HSC Cards on page 5-11

)

FAIL

 indicator is lit and/

or 

RUN

 indicator is off 

on a single T1 module; 
all other T1 modules 
show normal 

FAIL

 and 

RUN

 indicator states.

T1 module is faulty.

Replace the module (see 

Module 

Troubleshooting 

on page 

4-6

).

Software error occurred 
on the CP module, 
causing the T1 module to 
initialize improperly.

1. Turn the CPX rear circuit breaker 

switch off, then on again.

2. After the system initializes, verify 

that the T1 module 

FAIL

 indicator is 

off and the 

RUN

 indicator is lit.

Tx

 and/or 

Rx

 indicators 

on the STS-1 card are 
off.

Software error occurred 
on the CP module, 
causing the STS-1 module 
to initialize improperly.

1. Turn the CPX rear circuit breaker 

switch off, then on again.

2. After the system initializes, verify 

that the STS-1 module 

Tx

 and/or 

Rx

 

indicators are lit or flashing .

STS-1 module is faulty.

Replace the STS-1 module (see 

Module Troubleshooting 

on page 

4-6

).

Содержание Jetstream CPX-1000

Страница 1: ...Jetstream CPX 1000 Voice Services Platform Installation and Operation Release 2 5 Document No 1000 A2 GN22 00 February 2003...

Страница 2: ...al Warranty Sales Service and Training Information Contact your local sales representative service representative or distributor directly for any help needed For additional information concerning warr...

Страница 3: ...f fire use only UL Listed or CSA Certified or comparable cables which are certified for use in the country of installation cable s that are suitably rated for the application 7 A rare phenomenon can c...

Страница 4: ...he CE mark on the equipment label a supporting Declaration of Conformity may be downloaded from the Paradyne World Wide Web site at www paradyne com Select Library Technical Manuals CE Declarations of...

Страница 5: ...Services Platform 1 3 Packet Network Configuration 1 4 Call Origination and Completion 1 6 CPX 1000 Calling Features 1 8 CPX 1000 Management Tools and APIs 1 9 Chapter 2 CPX 1000 Voice Services Platf...

Страница 6: ...1 2 30 ATM OC 3 Module 2 32 Echo Cancellation Module 2 35 Echo Cancellation and Compression Module ECAC 2 36 DC Power Supply Fan and Fan Modules 2 37 DC Power Distribution Panel 2 39 Chapter 3 Instal...

Страница 7: ...rdware Installation 3 23 Attach OC 3 ATM Cables 3 24 Attach Ethernet Cables 3 25 Attach MP Card to CP Cards 3 25 Connect the CPX to the LAN 3 25 Attach CP Redundancy Cable 3 25 Attach the T 1 DS 1 Cab...

Страница 8: ...r Off 5 1 Emergency Power Off 5 1 Power Supply Fan Module Removal 5 2 Replacing Inoperative Fans 5 2 Install Power Supply Fan Module 5 3 Alarm Panel 5 4 Removing the Alarm Panel 5 4 Installing the Ala...

Страница 9: ...exit A 6 help A 6 setpassword A 6 showadminstate A 6 showclock A 6 showecac A 7 showport A 7 showportgroups A 7 showpps A 7 showpstnpg A 7 stats A 7 status A 7 sub A 8 Admin Console Commands A 8 clear...

Страница 10: ...Table of Contents 1000 A2 GN22 00 vi February 2003 Appendix B Pin Assignments and Indicators System Alarm Connection Requirements B 7 Appendix C Replacement Parts Appendix D Specifications Index...

Страница 11: ...d the role of the CPX 1000 Voice Services Platform in implementing voice over DSL T1 and wireless broadband networks Chapter 2 CPX 1000 Voice Services Platform Description describes the features compo...

Страница 12: ...tstream Media Gateway Systems JetCraft User s Guide Describes how to install Paradyne Jetstream craft interface terminal software and provides instructions to configure a CPX 1000 Voice Services platf...

Страница 13: ...you to a laser hazard never look directly into the source of a laser beam which may be invisible Voice Data Interruption Alerts you to an action that if done incorrectly will interrupt voice or data t...

Страница 14: ...Preface 1000 A2 GN22 00 x February 2003...

Страница 15: ...tegrated Communication Providers ICPs to deliver a combination of voice and data services to their subscribers over the local loop Our Voice over Broadband VoBB local access network alternatives Figur...

Страница 16: ...d local access network Figure 1 2 Figure 1 2 VoBB Network Architecture The CPX 1000 Voice Services Platform architecture provides seamless integration of voice and data networks These networks compris...

Страница 17: ...emises The benefits of this architecture are better voice quality by performing analog to digital conversion near the phone more efficient use of copper connections between the subscriber premises and...

Страница 18: ...the voice and management traffic associated with all of the subscriber s telephone lines The voice PVC is configured as a variable bit rate real time VBR rt PVC and has priority over the data PVC The...

Страница 19: ...igure 1 4 Figure 1 4 Bandwidth Usage 768 kbps SDSL Circuit However many network operators have Frame Relay based local access networks interconnected with ATM networks The CPX can interface with the F...

Страница 20: ...ocol Time Management Channel TMC 4 The Class 5 switch selects the available time slot in a PSTN interface group and directs the CPX to connect the IAD port to the specified time slot on the switch 5 T...

Страница 21: ...4 The CPX connects the specified time slot to an IAD port 5 The IAD initiates ringing 6 The IAD notifies the switch via the CPX when the first ring is complete and connects the station through to the...

Страница 22: ...quotes Off hook message delivery caller ID call waiting Flash features call waiting 3 way calling call hold call transfer In band calling features stutter dial tone for message waiting code activated...

Страница 23: ...S via the JetWay API See the JetVision User s Guide for more information Jetway JetWay is an API Application Program Interface for JetVision that enables northbound network management systems to integ...

Страница 24: ...1 Voice over Broadband Networking 1000 A2 GN22 00 1 10 February 2003...

Страница 25: ...ted shelf that resides in an Integrated Service Provider s ICP s Regional Service Center RSC Figure 2 1 CPX 1000 Front View 0484 1 2 3 4 5 6 7 9 11 12 13 14 MINOR MAJOR CRITICAL 1 2 3 4 5 6 7 8 9 10 1...

Страница 26: ...ection over the access network to each end user Concentration management supports line concentration levels up to 40 1 System and Service Administration acts as the administrative platform for managin...

Страница 27: ...alls and 16 000 subscriber lines 8 1 concentration Carriers can upgrade the CPX network by adding additional CPX 1000s all of which can be managed by a single JetVision workstation CPX 1000 Operation...

Страница 28: ...Process Management Process Echo Cancellation and Compression Voice Bus Voice Voice Voice Control Splitter Control T1 Interface Controller OC3 Port Q 931 LAPD Link Layer ATM Modules Packet Interface CP...

Страница 29: ...C Process Management Process LAN Connection To From Network Management System Voice Bus Voice Voice Voice Control Splitter Control STS 1 Interface OC3 Port ATM Lines To From Packet Switch PSTN Lines T...

Страница 30: ...en interacts with the management process to complete these requests 3 The management process notifies the EOC process about changes in the operating status of the CPX managed objects 4 The EOC process...

Страница 31: ...network It also converts packet cells to voice timeslots The Voice Control Splitter directs the ATM cells which contain call control and signaling through the IAD Signaling and Connectivity function t...

Страница 32: ...4 8 with a remainder of 0 and 36 4 9 with a remainder of 0 Pair C yields a different remainder 38 4 9 remainder 2 Therefore it is not in the same group with A and B A maximum 4 096 IADs can be assign...

Страница 33: ...er Distribution Grounding Phillips Screws 1 2 3 4 5 6 7 9 11 12 13 14 MINOR MAJOR CRITICAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DISABLED UNLOCKED DISABLED UNLOCKED DISABLED ALERT A ALERT B ALERT C UNLO...

Страница 34: ...anel The CPX alarm panel is located on the top front of the shelf Indicators display the current operating status of the shelf and an alarm connector outputs to remote Telco alarm equipment Figure 2 5...

Страница 35: ...escription Alarm Indicator Status Description Slot Status Act Unlocked Disabled Module is in Active state not Standby Module administrative state is Unlocked Module operational state is Disabled Syste...

Страница 36: ...T1 module The 12 port T1 ECAC module provides onboard echo cancellation and compression See Chapter 3 Installing the CPX 1000 for more information Line Modules with STS 1 When configured with STS 1 th...

Страница 37: ...RAM Hot Swap Controller HSC card maintains each module s status controls power and each module s reset monitors and controls peripherals including power fan modules board and system indicators alarms...

Страница 38: ...ircuit is in use T64 2 ETHERNET Connects to CP B module s Ethernet port LINK green Link is established ACT Amber Ethernet circuit is in use 10 100 BASE T Connects to MP card COM 1 Not used RST Resets...

Страница 39: ...dles all call processing activity maintains all signaling manages all IADs captures statistics and alarms and monitors all hardware in the system It passes all this information to the management syste...

Страница 40: ...re Failure of the High Availability software to detect a ping request from the ping component on a CP module Administrative switchover the network administrator initiates a CP switchover using JetCraf...

Страница 41: ...the CPX Configuration management fault management and remote software upgrade of the IADs High performance memory resident database for configurations persistence Real time performance and error stati...

Страница 42: ...2 8 Management Processor Module P I M 1 ETHERNET 2 ETHERNET 1 0449 Management Processor Transition Card Shelf Rear Management Processor Shelf Front Link Status LEDs V I D E O C O M 2 ETHERNET Receive...

Страница 43: ...ort LINK green Link is established ACT Amber Ethernet circuit is in use ETHERNET Connects to LAN or PC for access to network management systems Port is only in service when no MP transition card is pr...

Страница 44: ...fully operational system Figure 2 9A so that the interface can still handle the busy hour call volume even when one of the T1 modules has failed Figure 2 9B T1 port failure interface groups comprise...

Страница 45: ...e supports eight T1 interfaces to the Class 5 switch The T1 module consists of two separate cards Figure 2 11 0228 T1 Modules all operational IG 1 IG 2 A Full Capacity all TDM modules operational B Di...

Страница 46: ...ht T1 interfaces via RJ 48C jacks 1 through 8 plus a Line Interface Unit LIU to insert framing and supervision signals into the T1 data stream Table 2 5 describes the controls indicators and ports of...

Страница 47: ...aces via the RJ 21X port attached to a patch panel plus a Line Interface Unit LIU that inserts framing and supervision signals into the T1 data stream Table 2 6 describes the controls indicators and p...

Страница 48: ...000 A2 GN22 00 2 24 February 2003 Figure 2 12 12 port T1 ECAC and T1 Transition Cards 0479 RJ 21X Port 12 PORT T1 10 BT ETH BITS PCM TEST RS 232 0478 HOT SWAP 4 8 3 7 2 6 1 5 11 12 9 10 S A T T A T C...

Страница 49: ...on If compression is required an Echo Cancellation and Compression card may be added Debug interfaces are also provided The STS 1 module increases the traffic capacity of the CPX over what can otherwi...

Страница 50: ...e GR 303 protocol including full GR 303 line concentration CLASS and calling features full EOC TMC and path protection switching S T A T T X A C T R X Hot Swap 0421 RS 232 PROT SWITCH TX RX P C M T E...

Страница 51: ...ng red indicates board error ACTivity Lit green when card is active Unlit when card is in standby mode TX Lights solid green when transmitting data Lights flashing red when SONET Far End Section recei...

Страница 52: ...through an external STS 1 mux before being connected to the switch STS 1 ECAC Processing Card controls the 28 DS1s in an STS 1 circuit plus onboard echo cancellation and compression STS 1 Transition C...

Страница 53: ...ol channels in the GR 303 Interface group Table 2 7 describes the controls indicators and ports of the STS 1 module ports and indicators Table 2 8 STS 1 ECAC Module Controls Indicators and Ports Cards...

Страница 54: ...n Switching Unused TX STS 1 Port Transmits data to Class 5 switch RX STS port RX STS 1 Port Receive data from Class 5 switch TX STS port Table 2 8 STS 1 ECAC Module Controls Indicators and Ports Conti...

Страница 55: ...to the standby STS 1 module Administrative switchover the network administrator initiates the switchover to the standby STS 1 module Each pair of redundant STS 1 cards has the following connections a...

Страница 56: ...he ATM modules are unlocked the primary ATM module becomes active and the secondary ATM module becomes standby This architecture enables two types of ATM module switchovers Automatic switchover the sy...

Страница 57: ...1 LASER Use of controls adjustment or performance of procedures other than those specified herein may result in hazardous invisible radiation exposure Notes Do not mix optical modes If you are using s...

Страница 58: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 34 February 2003 Figure 2 16 ATM OC 3 Module Status Tx Rx ATM155 0160 ATM OC 3 SC Ports Dust Cover Status LEDs Tx Rx...

Страница 59: ...p to 64 milliseconds per channel for up to 672 DS0s in accordance with ITU G 165 and ITU G 168 The Echo Cancellation module is only used when echo cancellation is needed in conjunction with the Octal...

Страница 60: ...per byte 16 kbps Voice Compression refers to the industry standard compression algorithm of voice data passed between the CPX and an IAD Voice data compression decreases the bandwidth used on the mos...

Страница 61: ...19 DC Power Supply Fan Modules Three fans provide forced air cooling for the power supplies card cage and transition module card cage rear of shelf The fans mount on the front of the shelf in each Pow...

Страница 62: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 38 February 2003 Figure 2 20 Shelf Airflow 0383 Front Cards CPU Line Transition Cards Side to Side Plenum Shutter Side to Side Plenum...

Страница 63: ...stribution Unit PDU provides power from input power A to power supplies 1 and 2 input power B supplies power to power supplies 2 and 3 Thus if either input power source fails two power supplies are st...

Страница 64: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 40 February 2003...

Страница 65: ...1 2 3 4 5 6 7 9 11 12 13 14 MINOR MAJOR CRITICAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DISABLED UNLOCKED DISABLED UNLOCKED DISABLED ALERT A ALERT B ALERT C UNLOCKED DISABLED UNLOCKED DISABLED UNLOCKED D...

Страница 66: ...ventory CPX components 3 11 Attach mounting flanges 3 12 Mount CPX in rack optionally mount Splitter Assembly 3 13 3 16 Connect plant battery and frame ground to CPX shelf 3 16 Install modules cards i...

Страница 67: ...ators 3 33 Check cooling fan operation 3 34 Verify remote interface 3 34 Optional attach bezel to front of CPX Use Bezel Install Guide Connect CPX to JetCraft PC 3 34 Verify CPX LAN connnection 3 35 P...

Страница 68: ...ngs and obtain provisioning settings from switch personnel as appropriate Check the bit error rate BER on every GR 303 PSTN line Using Console perform a stats command on everything Refer to Appendix A...

Страница 69: ...ties preparation and CPX installation practices described in this document conform to Telecom and other industry regulatory standards Ensure that any additional preparation work complies with local bu...

Страница 70: ...strap to the grounding jack located on the front or rear of the equipment Handle all module cards by the face plate extraction ears or assembly edges Never touch the components conductors or connecto...

Страница 71: ...act your local Paradyne representative for service and repair questions and information Aisle Requirements Maintain at least 30 inches aisle space for equipment mounting and wiring and at least 42 inc...

Страница 72: ...h supply Rack Requirements The CPX measures 21 inches high 17 2 inches wide 19 inches including mounting flanges 17 inches deep The STS 1 Splitter Assembly measures 3 4 inches high 17 2 inches wide an...

Страница 73: ...Digital voltmeter capable of measuring 72 Vdc Ring lugs for 14 16 AWG wire and 10 stud size Caltronics RT 117 or equivalent Ring lug crimper Cable ties or wraps Cable identification tags or markers F...

Страница 74: ...the shipping container for damage Step 2 Cut the shipping bands and remove the top of the box 0088b 1 2 3 4 5 6 7 9 11 12 13 14 ALARM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DISABLED UNLOCKED DISABLED UN...

Страница 75: ...nning installation inventory the components against your packing list or order If any components are missing notify the Technical Support Center TSC Typical contents will include 1 CPX Chassis 1 MP Ca...

Страница 76: ...nting shelf in rack Mounting Flanges in 19 Configuration 0486 1 2 3 4 5 6 7 9 11 12 13 14 ALARM 1 2 3 4 5 6 7 9 11 12 13 14 ALARM Top View Top View 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DISABLED UNLOCKE...

Страница 77: ...u plan to install more than one CPX mount the first unit in the bottom of the rack Otherwise select a height consistent with local practices for partially loaded racks Clearances shown are recommendat...

Страница 78: ...ARD 10 100 ETHERNET LNK 2 ACT LNK 1 ACT CP2 HOT SWAP 4 8 3 7 2 6 1 5 11 12 9 10 S A T T A T C TDM 12E1 T1 HOT SWAP 4 8 3 7 2 6 1 5 11 12 9 10 S A T T A T C TDM 12E1 T1 HOT SWAP 4 8 3 7 2 6 1 5 11 12 9...

Страница 79: ...n modules Step 5 Repeat these steps for each shelf to be mounted in the rack Caution To help reduce risk of injury while lifting the shelf reduce the shelf weight by removing the power supply fan modu...

Страница 80: ...t these steps for each Splitter Assembly Connect Plant Battery and Frame Ground Power comes in to the CPX rear panel at the A and B plant battery power strips The A and B power legs each may be connec...

Страница 81: ...e a wrist grounding strap attached to the grounding jack on the CPX enclosure when working with the system ESD can seriously damage the printed circuit card assemblies and solid state components insid...

Страница 82: ...CPX to the A and B terminals of the power source as in step 5 Step 7 Run the 48V power and battery return wires across the back of each CPX shelf and along the side of the equipment rack or use the op...

Страница 83: ...d STS 1 modules to provide echo cancellation or echo cancellation and compression You can identify each card by its abbreviation printed on the face of the top ejector handle Figure 3 1 shows the fron...

Страница 84: ...LNK 1 ACT CP2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Slot Numbers 12 Port T1 ECAC Modules 12 Port T1 ECAC Modules Management Processor Module ATM OC 3 Modules Call Processor Module Sets HOT SWAP 4 8 3...

Страница 85: ...T USB 0 CPU PCI ABT PWR ERROR PWR ERROR PCI MEZZANINE CARD BFL RST CPCI USB 1 COM 1 10 100 BASE T USB 0 CPU PCI ABT RESET EXT ETHERNET P M C 1 P M C 2 COM 1 PWR 10 100 ETHERNET LNK 2 ACT LNK 1 ACT St...

Страница 86: ...and plug the other end of that strap into the ESD ground jack in front or back of the CPX shelf Step 2 Slide each module into the cage slot until its ejector handles engage the retention bars at the t...

Страница 87: ...to site engineering plans at the plant battery branch circuit panel Step 4 Using a digital voltmeter measure that plant battery is 48 VDC at the 48 VDC A and RTN A battery return terminals on the CPX...

Страница 88: ...ransmit and receive connectors into the ATM fiber optic SC connector sockets CAUTION CLASS 1 LASER Laser hazard never look directly into the OC 3 connectors They are a source of a laser beam which may...

Страница 89: ...CP cards at the front shelf using the cable provided 1 2 3 4 5 6 8 10 7 9 11 12 13 14 15 16 PWR ERROR PWR ERROR P M C 1 RESET EXT ETHERNET P M C 2 COM 1 PWR 10 100 ETHERNET LNK 2 ACT LNK 1 ACT Status...

Страница 90: ...the host switch to T1 DS 1 groups Each T1 connection is assigned a T1 DS 1 group number and an individual connection number such as 1 1 T 1 1 must connect to T1 DS 1 1 at the Class 5 switch etc A T1 D...

Страница 91: ...X1 FROM NET RX2 TX1 TO NET TX2 RX1 FROM NET RX2 Tx Rx TX RX R0004 LOS LOF AIS RAI Tx Rx TX RX R0004 LOS LOF AIS RAI Tx Rx TX RX R0004 LOS LOF AIS RAI Tx Rx TX RX R0004 LOS LOF AIS RAI ETHERNET 2 ETHER...

Страница 92: ...panel or directly to the Class 5 switch Steps for connecting the RJ 21X cable to a patch panel are described below For completing the connection of the T1 circuits from the Class 5 switch to the patch...

Страница 93: ...Installing the CPX 1000 Connect the RJ 21X cable to the patch panel Step 1 Connect the RJ 21X jack to the RJ 21X port on the back of the 12 port T1 transition card Step 2 Punch down each T1 circuit o...

Страница 94: ...the Class 5 switch via two STS 1 cables connected from the STS 1 Splitter Assembly Each STS 1 module includes a corresponding STS 1 transition module that is accessible from the rear of the shelf Each...

Страница 95: ...ctors on the Class 5 switch Step 5 Dress the STS 1 and power cables from the rear of the shelf so the cables run in a manner that minimizes interference with STS 1 Transition module replacement 16 15...

Страница 96: ...the DSX All connections should be made from the RJ48C patch panel which in turn is connected via the 25 pair cable to the RJ 21X port on the 12 port T1 transition modules of the CPX shelf Step 4 STS 1...

Страница 97: ...S indicator blinks to indicate heartbeat is present STATUS lights solid when there is a problem The Tx and Rx indicators will light when data transmission and reception occurs Step 5 Octal T1 Module V...

Страница 98: ...equipped with an integral fan assembly and a third fan is supplied for redundancy in case one of the other two fans fails Step 1 When power is first applied the fans should run continuously circulati...

Страница 99: ...straight through cable Step 2 Ping the CPX from a PC on the same LAN as the CPX Step 3 At the MP Transition card verify that the Ethernet green LINK indicator is lit and the amber ACTivity indicator b...

Страница 100: ...3 Installing the CPX 1000 1000 A2 GN22 00 3 36 February 2003...

Страница 101: ...e 4 3 lists the sequence of systems to check The tables on the following pages provide specific LED alarm and status indicators which will help you troubleshoot the problem Power System Troubleshootin...

Страница 102: ...se of the problem Develop a troubleshooting action plan Identify the symptoms get as much information as you can What changes to operation or performance occurred Check equipment for red fault lights...

Страница 103: ...ly 3 Inspect the CPX shelf itself Using the JetCraft Alarm Window To resolve CPX problems using the JetCraft alarm window 1 Display the JetCraft Main window 2 Identify the failed module in the alarm w...

Страница 104: ...t locked see below Unlocked Green Green when card is discovered initialized and placed in service able to carry traffic Off when card is locked no traffic Act Active Amber Green Amber light indicates...

Страница 105: ...r is on continued PSTN Loss of signal or loss of frame section Alarm indication signal line or STS path Loss of pointer or unequipped STS path Payload label mismatch STS path T 1 ports PSTN Loss of fr...

Страница 106: ...gnal DS1 PSTN Remote Alarm indication DS1 MINOR indicator on IAD Provisioned compression scheme s not supported Table 4 2 Telco Status Indicators Continued Symptom Possible Cause Further Isolation of...

Страница 107: ...he LAN port Voice Data Interruption Do not press the RST button on the CP module Doing so resets the CPX shelf and interrupts all calls Table 4 4 CP Module Troubleshooting Symptom Probable Causes Corr...

Страница 108: ...litting receive and transmit signal to two STS cards The active STS card receive and transmits signal The standby card only receives signal The Splitter Assembly is shipped with BNC terminators in pla...

Страница 109: ...on again 2 After the system initializes verify that all T1 module FAIL indicators are off and RUN indicators are lit CP module is faulty Switch over CP to standby If required swap out see Hot Swappin...

Страница 110: ...l is up between switch and CPX 2 Verify that the interface group is active in the switch Primary Embedded Operation Channel EOC is down CPX and Class 5 switch connection has been lost 1 Verify that th...

Страница 111: ...ATM module is faulty Replace the ATM module see Module Troubleshooting on page 4 6 Table 4 8 Ethernet LAN Troubleshooting Symptom Probable Causes Corrective Action Ethernet link green indicator is no...

Страница 112: ...igure 4 2 Figure 4 2 Power Panel and Circuit Breaker After you apply power to the CPX if none of its front panel indicators light and if its internal fans are not working refer to Table 4 9 for troubl...

Страница 113: ...ery return connections between the power source and CPX A and B terminals see Figure 4 2 2 Replace faulty wiring as required 48 VDC plant battery source is faulty 1 Verify that the 48VDC plant battery...

Страница 114: ...o loopback status Step 3 Temporarily remove any existing T 1 cable from the port and connect a loopback plug to the port Step 4 Observe the results of the loopback test Step 5 When the loopback test i...

Страница 115: ...n dual configured systems both domains lose input power This procedure is recommended when powering off the CPX Step 1 Shut down all software operations JetVision JetCraft Step 2 Flip the rocker switc...

Страница 116: ...eplace the affected fan assembly Figure 5 1 To replace hot swap a fan without removing the module or turning off power Step 1 Remove the filter from the power supply to expose four screws Step 2 Loose...

Страница 117: ...odule during insertion Step 2 Tighten the two screws located on the bottom front of the module Warning Do not operate the CPX for more than 15 minutes without a fan or the power supply module may over...

Страница 118: ...two retaining clips out to force the connector off of the header Figure 5 2 Alarm Panel Removal Note If the alarm panel is connected to remote alarm monitoring equipment removing the system alarm cab...

Страница 119: ...secure the panel with the two captive screws provided Power Distribution Panel The Power Distribution Panel is not hot swappable Removing the panel removes power from the the power supplies Removing...

Страница 120: ...re that the panel s connectors are aligned with the power supply connectors and that they seat firmly Note You may need to pull on the captive screws to move the panel out enough to grasp by the side...

Страница 121: ...10 Caution If the panel does not fully insert do not force it forcing it can bend the connector pins Instead back the panel out verify that the connectors are aligned properly and re insert it CAUTION...

Страница 122: ...f the equipment Warning Handle circuit cards by the face plate extraction ears or assembly edges Never touch components conductors or connector pins Always store and transport cards in antistatic pack...

Страница 123: ...d ejectors Figure 5 4 and wait for the Hot Swap light the blue laser at the bottom of some cards Figure 5 4 Module Extractors Step 5 Remove the line front card Step 6 Remove the transition rear card S...

Страница 124: ...tion menu A prompt displays to confirm you want to remove the resources Step 4 Click Yes The card is removed from the Tree and Shelf views Step 5 Remove and replace with the new cards per Removing and...

Страница 125: ...t Configuration Remove Resources A prompt displays confirming you want to remove the card resources Step 5 Click Yes The card is removed from the Tree and Shelf views Step 6 Remove the CP card followe...

Страница 126: ...n place using the card ejectors Step 7 Select File Refresh CPX The new card appears in the Tree and Shelf views The state of the card automatically changes to unlocked and all resources for that card...

Страница 127: ...refer to JetVision User s Guide and Step 1 Insert a card to its assigned slot Step 2 Snap the card ejectors into the locked position Step 3 Select Refresh in JetCraft to see the new card s Step 4 Prov...

Страница 128: ...5 Repair Procedures 1000 A2 GN22 00 5 14 February 2003...

Страница 129: ...ccess and default usernames and passwords assigned to them The default Telnet port numbers CP A 5050 CP B 6050 Logging In To log in to the control console Step 1 Click the Start button then click Run...

Страница 130: ...ensitive they automatically converted to lower case upon entry The Up and Down arrows show the command history To allow spaces in a command line argument surround the whole argument in double quotes P...

Страница 131: ...ure A 2 A Sample Listing of Console Commands Cpx Displays a summary of all user or admin commands Cpx command name Displays detailed help on command name Cpx command name Displays detailed help about...

Страница 132: ...mmary or usage information setpassword Changes password of a user showadminstate Shows the administrative state of the specified component showclock Displays the entire clock priority table showecac S...

Страница 133: ...ng Telnet info is the Cpx Displays a summary of all user or admin commands Cpx command name Displays detailed help on command name Cpx command name Displays detailed help about command name Displays c...

Страница 134: ...ailed help on command name setpassword To change default password use set password cond setpassword username new password Example A AC cpx setpassword user user1 showadminstate Shows the administrativ...

Страница 135: ...howpstnpg all Cpx showpstnpg pg instance 1 78 stats Displays statistics for the component specified Cpx stats sys Cpx stats ifg ifg Cpx stats ds1 ifg ds1 Cpx stats sub sub Cpx stats port sub port Cpx...

Страница 136: ...speeds Cpx fan Displays the current speed of all the PowerSupply fans Cpx fan 1 3 all stat Displays the current fan speed Cpx fan 1 3 all low high Sets the fan speed to Low or High Where all all fans...

Страница 137: ...immediately setactiveport Sets the active port in an ATM port group Cpx setactiveport portgroup port setcdv Displays sets ATM Cell Delay Variation CDV Cpx setcdv Displays current Cell Delay Variation...

Страница 138: ...d PSTN port ds0 Monitor timeslot on the specified DS1 DS0 Cpx tap off timeslot Disable existing tap on timeslot Where timeslot H 110 timeslot to tap 0 4095 get from sub or crv displays Note For STS 1...

Страница 139: ...ns and pinouts for connecting the CPX to the external systems during installation CPX 1000 connections and cables Table B 1 Ethernet LAN jack pin assignments Table B 2 T1 transition module pin assignm...

Страница 140: ...Rcv power Multi mode 44 5 dBm to 8 dBm Single mode 34 dBm to 8 dBm Wave length 1310 nm typical Framing type C bit parity Logical interface UNI Max span length SMF 5000m MMF 550m ATM packet network DS...

Страница 141: ...B DSX 1 Framing ESF 10 ms maximum Line coding B8ZS Clock T 1 DS 1 Rcv span defaults to internal if Rcv fails STS 1 PSTN Host Class 5 switch Physical interface DS 3 short haul coaxial cable STS 1 modul...

Страница 142: ...installed at 40 VDC for duration 4 ms Frame ground Stranded copper wire must be larger than the wire size used for 48V power and ground wiring 6 AWG recommended This cable must be fitted with a Type L...

Страница 143: ...000 A2 GN22 00 B Pin Assignments and Indicators Table B 3 T1 Transition Module Pin Assignments Pin Signal Pin Signal 1 Rx Ring 5 Tx Ring 2 Rx Tip 6 Not connected 3 Not connected 7 Not connected 4 Tx T...

Страница 144: ...4 9 Red Brown Tx5 Rx5 Slate Red 35 10 Red Slate Rx5 Tx6 Blue Black 36 11 Black Blue Tx6 Rx6 Orange Black 37 12 Black Orange Rx6 Tx7 Green Black 38 13 Black Green Tx7 Rx7 Brown Black 39 14 Black Brown...

Страница 145: ...nce equipment The closure specifications are Rated resistive load 20 Ohms typical 50 mA 5 Ohms typical 100 mA Rated inductive load not applicable Operating voltage 100 VDC VAC 350 VDC or peak ac for 1...

Страница 146: ...nts Pin Signal Pin Signal 1 Rx Ring 5 Tx Ring 2 Rx Tip 6 Not connected 3 Not connected 7 Not connected 4 Tx Tip 8 Not connected Table B 7 Ethernet LAN Jack Pin Assignments Pin Signal Pin Signal 1 Tx t...

Страница 147: ...ansition cards 1001 B1 003 TDM 12 Port T1 T1 ECAC Module with onboard Echo Cancellation and Compression processing and transition cards 1001 B1 004 TDM STS1 1 STS 1 Module with Echo Cancellation proce...

Страница 148: ...d 48VDC Power Supply Fan module 1000 F1 802 Power Distribution Module Power Distribution module 1000 F1 804 Alarm Module Chassis alarm panel for HA systems 1000 F1 805 Fan Filter Air Filter Kit 3 filt...

Страница 149: ...ibility and electrical safety generic criteria for network telecommunications equipment GR 1089 CORE The tables below provide CPX 1000 specifications for the following categories Physical Table D 1 on...

Страница 150: ...shipping weight GR 63 CORE O2 18 R2 19 Aisle Requirements Minimum of 30 inches of aisle space for equipment mounting and 42 inches of aisle space for maintenance purposes Equipment floor plan 18 inch...

Страница 151: ...temperature derating 60m to 1800m above sea level 200 ft to 5905 ft GR 63 CORE R4 8 with temperature derating 1800 to 4000m above sea level 5095 ft to 13 123 ft GR 63 CORE R4 9 O4 10 Airborne contamin...

Страница 152: ...power 15 amps 48 Vdc with a 40A 4 ms surge Estimated not actual Max BTU 1720 BTU hour Estimated not actual Frame Grounding Stranded copper wire must be larger than the wire size used for 48V power an...

Страница 153: ...ft 133 266 ft 399 533 ft 533 655 ft customer order T1 Max span length 0 5000 ft NEBS certified Termination RJ 48C plug Signal amplitude 2 4 to 3 6V DSX 1 Rcv Attenuation 10dB DSX 1 Framing ESF 10 ms m...

Страница 154: ...l interface UNI Max span length 5000 ft Ethernet LAN Physical interface CAT 5 or equivalent cable for 10Base T or 100Base T Termination RJ 45 plug Alarm Output Connection Wiring requirement 22 AWG Tel...

Страница 155: ...57 In Transit 3 axis Curve 1 GR 63 CORE R4 58 Maximum BTU 1720 BTU hour Heat dissipation forced air 300W m sq per meter of frame height used 38 C 86 F max aisle facing surface 26 C 80 F ambient tempe...

Страница 156: ...D Specifications 1000 A2 GN22 00 D 8 February 2003...

Страница 157: ...ATM networks B 2 ATM OC 3 Module controls indicators and ports 2 33 ATM 25 module pin assignments B 5 B 6 B 8 B battery 3 8 B 2 checking voltage levels 3 23 connecting 3 16 3 17 return wires 3 8 3 18...

Страница 158: ...8 3 12 electrical hazards ix 3 16 5 2 environmental requirements 3 7 equipment racks 3 8 attaching mounting flanges 3 12 mounting the STS 1 Splitter Assembly 3 16 power requirements 3 8 ESD damage pr...

Страница 159: ...racks 3 8 3 12 networks B 2 ATM connections 3 24 Ethernet LANs connections 3 25 host Class 5 connections 3 26 3 29 3 30 troubleshooting Ethernet LANs 4 11 verifying ATM connections 3 32 verifying Ethe...

Страница 160: ...1 Module controls indicators and ports 2 27 2 29 generally 2 25 supports GR 303 2 26 2 29 STS 1 PSTN Module specifications B 3 troubleshooting 4 9 STS 1 Splitter Assembly mounting in rack 3 16 STS 1 s...

Отзывы: