
Monitoring the Unit
6-7
7925-A2-GB20-30
PRELIMINARY DRAFT
June 1997
V.35-Compatible Unit
The green PWR LED lights whenever power is applied to the board. Loop LEDs
blink until the loop has been synchronized and then remain off.
TERMINAL
E1 HDSL
DTR
DSR
Loop BkPWR
FAIL
Loop A Loop B
7900
CTS
RT
S
RXD
TXD
97-15263
LED
Meaning
Loop Bk
A bilateral loopback has been initiated for testing the equipment
connected to this unit.
PWR
Power is applied to the unit.
FAIL
The processor has halted and repairs are required.
Loop A
A failure in HDSL Loop A. (The LED will blink at board power up until the
loop has been synchronized.)
Loop B
A failure in HDSL Loop B or the loop has been disabled. (The LED will
blink at board power up until the loop has been synchronized.)