
23
Verifying the End-to-End Path
After installation of a remote site unit, run an IP Ping test to Ping the NMS at the central
site and verify that the entire path from the remote unit to the NMS is functioning. To run
the IP Ping test, NMS trap managers must have been configured for the remote unit.
One of those trap managers must be the central site NMS.
Procedure
1.
Select the IP Ping test.
Main Menu
→
Test
→
IP Ping
2.
Enter the IP Address of the device being Pinged, then select Start.
NOTE:
When running tests, the cursor is positioned over the Start command. Press
Enter to start the test. Stop is displayed while the test is running. Press Enter
again to issue the Stop command.
—
While the test is running,
In Progress...
appears in the Status field.
—
When the test is finished,
Alive. Latency =
nn ms
should appear as the
Status (
nn being the amount of time the test took in milliseconds).
If any other message is displayed, additional testing will be required. See
Device
Messages in the FrameSaver SLV Operations Guide for information about IP
Ping-related messages.
Содержание FrameSaver SLV 9626
Страница 35: ...35 ...
Страница 36: ... 9626 A2 GN10 40 9626 A2 GN10 40 ...