background image

TM

 1

9580-A2-GZ40-10

June 1999

FrameSaver

 SLV 9580 T3 ATM DSU 

Installation Instructions

Document Number 9580-A2-GZ40-10

June 1999

Installation Checklist

Installation of the FrameSaver SLV 9580 DSU requires the following steps:

Verify the contents of the shipping carton

Mount the DSU in a cabinet or on open rails

Connect the DSU to a power source

Monitor the power-up self-test

Connect the DSU to its DS3 interface

Connect the DSU to its DTEs

Connect the DSU to an Ethernet interface

Connect the DSU to a terminal or PC, directly or through a modem

Enter a device profile

Set up system Login IDs and access levels

Configure the system

— Configure management PVCs and any other unique PVCs

— Enter and configure VPI/VCIs if your switch does not support traffic

descriptors

— Configure and run Auto-Configuration

Connect the DSU to its monitor and NetScout Probe, if used

Test the system

At any step, diagnose and correct any errors.

Physical installation is described in this document. For detailed configuration and
troubleshooting information, see the 

FrameSaver SLV 9580 T3 ATM DSU User’s

Guide (9580-A2-GB20).

Содержание FrameSaver SLV 9580 T3 ATM DSU

Страница 1: ...t the DSU to an Ethernet interface Connect the DSU to a terminal or PC directly or through a modem Enter a device profile Set up system Login IDs and access levels Configure the system Configure manag...

Страница 2: ...e mounted in a standard 19 inch or 23 inch cabinet or open rails and either flush with the mounting rails or approximately 4 inches forward of the rails The different configurations are accommodated b...

Страница 3: ...line up precisely with holes in the rail 2 Mark the holes in the rail where the two machine screws will go Then mark the opposite rail in the same positions 3 If the rack has threaded holes go to Step...

Страница 4: ...kets to the DSU with four 8 flathead screws Fra meSaverTM SLV 95 80 AI S XM T RC V LC V OO F LO S YE L PO RT 1 TD RD DS R DT R PO RT 2 NE TW OR K TD RD DS R DT R SY ST EM OK AL M TS T PW R FA N 98 160...

Страница 5: ...ver SLV 9580 DSU into position in the rack putting the screws through the keyed holes of the bracket Lower the DSU onto the screws 98 16024 8 Put a machine screw through the top hole of each bracket a...

Страница 6: ...connector of the power cable into the power receptacle on the back of the FrameSaver SLV 9580 DSU Fix the cable to the rail with a cable tie or other strain relief device 3 Connect the other end of th...

Страница 7: ...essage What It Indicates What To Do Bypassed Self test was disabled when the unit was powered up or reset No action needed CPU Fail The CPU failed internal testing 1 Reset the unit and try again 2 Cal...

Страница 8: ...the back of the FrameSaver SLV 9580 DSU Turn the cable connector clockwise to lock it 3 Fix the cables to the rail with a cable tie or other strain relief device 4 Connect the receive and transmit cab...

Страница 9: ...with the DSU NOTE If you wish to isolate the router from network activity until proper network operation has been verified do not connect the router to the DSU until the network has been configured a...

Страница 10: ...t supplied with the FrameSaver SLV 9580 DSU Procedure To connect the FrameSaver SLV 9580 DSU to an Ethernet hub or NIC 1 Select the correct cable To connect the LAN port to a hub use a standard 10Base...

Страница 11: ...connector of the cable onto the TERMINAL PORT socket on the back of the FrameSaver SLV 9580 DSU If the cable will be permanently attached fasten the connector and fix the cable to the rail with a cab...

Страница 12: ...Performance Monitoring VCC Loopback RTT Estimation Abort All Tests 98 16034a The PVC Connection Status screen allows jumps to other screens by use of virtual function keys Possible jumps are shown by...

Страница 13: ...s PVC Connection Entry Service Level Verification Entry to all of the FrameSaver SLV 9580 DSU s tasks begins at the Main Menu screen which has these menus or branches Select To Status View system stat...

Страница 14: ...I Supporting ILMI Date Time Procedure To set the Device Profile 1 Follow this menu selection sequence Main Menu Control Device Profile main control device_name PARADYNE 9580 Device Name Node A 05 13 2...

Страница 15: ...o configuration should not be run until you have used the Configure branch to set up any specific management PVCs required for your network Accessing and Displaying Configuration Options To display th...

Страница 16: ...PVC Connections Test User Interfaces Management and Communication Ctrl a to access these functions ESC for previous menu MainMenu Exit Save 3 Select the options you would like to configure Select To c...

Страница 17: ...management a corresponding DLCI for Port 1 and a management DLCI are created and connected for every VPI VCI discovered H 2MPorts An IWF DLCI containing three EDLCIs one for each port and one for mana...

Страница 18: ...2 Network PVC Tests Start and stop a PVC test in the direction of the network IP Ping Display the menu for running the PING function LED Test Perform a lamp test VCC Performance Monitoring Select Virt...

Отзывы: