1. Installation
2600-A2-GN20-10
January 2004
1-7
3. Identify six flat-head screws (for 19-inch racks) or six machine screws (for
23-inch racks) provided with the mounting brackets in the hardware kit.
4. Attach the brackets appropriate to your rack size. Tighten all screws firmly.
02-17324
23-inch (584 mm) EIA and Bay Networks
Rack Mount
21.1-inch (535 mm) Rack Mount
19-inch (483 mm) Rack Mount
23-inch (584 mm) Nortel
Rack Mount
All manuals and user guides at all-guides.com
Содержание BitStorm 2600
Страница 6: ...E January 2004 2600 A2 GN20 10 All manuals and user guides at all guides com a l l g u i d e s c o m...
Страница 34: ...2 Cabling 2 12 January 2004 2600 A2 GN20 10 All manuals and user guides at all guides com...
Страница 58: ...Index IN 4 January 2004 2600 A2 GN20 10 All manuals and user guides at all guides com...