2. BitStorm 1900 Installation and Testing
1900-A2-GN20-00
BitStorm 1900 Installation and Maintenance Guide
2-37
Step
Procedure
(continued)
5.)
Verify all necessary BS 1900 system components, hardware,
circuit packs, and cables are at the installation site and that they
are in good condition. If a Materials List is provided, verify the
packing list with it.
6.)
Determine if an AC or DC power card is to be used in the
configuration.
a.) If installing a DC power card, install the -48 V DC power
source.
7.)
Complete all remaining tasks in the order given unless otherwise
directed.
STOP
<RXKDYHFRPSOHWHGWKLVWDVN
Содержание BitStorm 1900
Страница 1: ...BitStorm 1900 IP DSLAM Installation and Maintenance Guide Document No 1900 A2 GN20 00 July 2002...
Страница 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 148: ...Appendix B Cabling Specifications B 132 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...