6-1
7970-A2-GB20-00
August 1999
Testing
6
Accessing the Test Menu
From the Test menu, you can run network tests, data port tests, and a front panel
lamp test.
To access the Test menu, follow this menu selection sequence:
Main Menu
→
Test
Î
ÎÎ
main/test
Hotwire
Model: 79xx
TEST
Network & DSX-1 Tests
(Models 7974, 7984)
Network Tests
(Models 7975, 7985)
Network & G.703 Tests
(Models 7976, 7986)
SYNC Data Port Tests
(Models 7975, 7985)
Device Tests
Abort All Tests
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
Select . . .
On . . .
To . . .
Network and DSX-1 Tests
Models 7974 and 7984
Start and stop tests on the DSX-1 or network interface.
Network Tests
Models 7975 and 7985
Start and stop tests on the network interface.
Network and G.703 Tests
Models 7976 and 7986
Start and stop tests on the G.703 or network interface.
SYNC Data Port Tests
Models 7975 and 7985
Start and stop tests on the SYNC Port interface.
Device Tests
All models
Start and stop lamp test.
Abort All Tests
All models
To abort all current tests excluding network-initiated
loopback tests. An aborted test may continue to run for a
few seconds as the abort command is sent to the
remote end and processed.
Содержание 7984
Страница 10: ...Contents vi 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Страница 44: ...Initial Startup and Configuration 3 16 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Страница 90: ...Testing 6 20 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Страница 104: ...Security 8 8 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Страница 154: ...Cables and Pin Assignments C 14 7970 A2 GB20 00 August 1999 This page intentionally left blank ...
Страница 156: ...Technical Specifications D 2 7970 A2 GB20 00 August 1999 ...