97-15251
Lever
Closure
Screw
8
3. Locate the T1/R1 connectors on the customer premises side of the punchdown
block or NID where the existing POTS wiring was removed in Step 3 on page 6.
Attach the jumper pair from P1/P2 labeled LINE in the POTS splitter to the T1/R1
connectors.
DSL/POTS
From Local
Loop
Wiring to
DSL Jack
Telephone Network Interface Device (NID)
Ground
Tip
T1
(Green)
97-15341
Jumper Wiring to
POTS Splitter
for POTS
Demarcation Point
Customer Premises
Ring
R1
(Red)
4. Snap the lever shut to
close the POTS splitter.
5. Use the 3/8
″
nut driver
on the closure screw to
securely close the housing.