8. Testing
8-20
March 2001
3160-A2-GB24-10
Aborting Test Patterns
Use the Abort command to stop all test patterns or any selected test pattern active
on the DSU/CSU.
Procedure
To abort test patterns:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Ptrns.
3. From the Patterns screen, select Abort.
4. From the Patterns Abort screen, press the desired Function key to abort either
All active test patterns, active Send test patterns, or the active Monitor (Mon)
test pattern.
If you select All, the DSU/CSU terminates all active test patterns and displays
the message
Command Complete
. Skip Step 5.
NOTE:
If you mistakenly choose to abort a test pattern that is not currently
running, a
Command Complete
message still displays and the test
pattern currently active still runs. Use the TStat branch to view the test
status to determine if the abort was successful.
F1
F2
F3
Test:
Rlpbk Lpbk Ptrns
F1
F2
F3
Patterns:
Abort Send Mon
F1
F2
F3
Patterns: Abort
All Send Mon
Содержание 3160-A4
Страница 14: ...Contents viii March 2001 3160 A2 GB24 10 ...
Страница 18: ...About This Guide xii March 2001 3160 A2 GB24 10 ...
Страница 26: ...1 Introduction 1 8 March 2001 3160 A2 GB24 10 ...
Страница 38: ...2 Installation 2 12 March 2001 3160 A2 GB24 10 ...
Страница 54: ...3 Using the Front Panel 3 16 March 2001 3160 A2 GB24 10 ...
Страница 102: ...4 Configuration 4 48 March 2001 3160 A2 GB24 10 ...
Страница 110: ...5 Security 5 8 March 2001 3160 A2 GB24 10 ...
Страница 162: ...8 Testing 8 24 March 2001 3160 A2 GB24 10 ...
Страница 164: ...A Front Panel Menu A 2 March 2001 3160 A2 GB24 10 ...
Страница 222: ...D Configuration Worksheets D 14 March 2001 3160 A2 GB24 10 ...
Страница 240: ...E Pin Assignments E 18 March 2001 3160 A2 GB24 10 ...
Страница 272: ...F SNMP MIB Objects F 32 March 2001 3160 A2 GB24 10 ...
Страница 280: ...G IP Network Addressing Scenarios G 8 March 2001 3160 A2 GB24 10 ...
Страница 300: ...J Equipment List J 2 March 2001 3160 A2 GB24 10 ...