10
FIGURE 10
STEP 10
• SECURELY
attach the FRONT LEG (1) to 425 BASE using two 1/2 X 3” BOLTS (15), two 1/2” WASHERS (12) and two 1/2” LOCK NUTS
(13). See FIGURE 10.
•
Route LEG PRESS CABLE (8) under the 3-1/2” PULLEY on the 425 BASE as shown in FIGURE 10.
8
13
12
1
1/2 X 3” 15
BASE
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2