![ParaBody 425103 Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/parabody/425103/425103_assembly-instructions-manual_752958033.webp)
33
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
FIGURE 38
STEP 37
• Assemble one 3-1/2” PULLEY (42) around the PEC DEC CABLE (98) and to the PULLEY BRACKET (29) using one 3/8 X 2”
BOLT (84), two 3/8” WASHERS (91) and one 3/8” LOCKNUT (92) as shown in FIGURE 37.
FIGURE 37
STEP 38
• Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 38.
• Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as
shown in FIGURE 38.
(NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The
cable retaining clips should be at approximately a 45°
angle.)
42
92
29
98
84 3/8 X 2”
91
98
24
98
PEC
CABLE
26
Содержание 425103
Страница 1: ...1 Part 6739601 Revision 11 19 98 ASSEMBLY INSTRUCTIONS 425103 HOME GYM ...
Страница 28: ...28 ...