14
FIGURE 14
STEP 14
• Securely assemble the WEIGHT STACK CABLE (26) and two 3-1/2” PULLEYS (19) to the TOP BOOM (7) using two 3/8 X 2-
3/4” BOLTS (48), four 3/8” FLANGE SPACERS (36), and two 3/8” LOCK NUTS (41) as shown in FIGURE 14.
(Note: Loop
the CABLE over the PULLEYS prior to inserting it into TOP BOOM.)
• Screw the threaded end of the WEIGHT STACK CABLE (26) into the end of the WEIGHT STACK SHAFT (21) until the
FLOATING PULLEY BRACKET (6) firmly contacts the FRONT UPRIGHT (2) and the CABLE (26) slightly pulls on the HEAD
PLATE (20). Tighten the jam nut securely. See FIGURE 14.
• Hang the FLOATING PULLEY BRACKET (6) over the WEIGHT STACK CABLE (26) as shown in FIGURE 14.
7
6
36
41
26
21
3/8 X 2-3/4” 48
36
19
* All connections use one 3/8 X 2-3/4” BOLT (48), two 3/8” FLANGE SPACERS (36), and one 3/8” LOCK NUT (41).
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
20