background image

1.  Begin by setting up the tripod base: press down 
on the slide yoke pin clip and swing the outer legs out 
until they lock in the working position (note the holes 
on the bottom of the slide tube).

2A.  Place the frame assembly on the tripod base.

2B.  Pocket “A” slides OvER angle “B” while angle 
“C” slides INSIDE angle “D”.

A

B

D

C

ASSEMBLY

- 4 -

2C.  To hold the tripod base in position during this 
procedure set the backstop as shown.

2D.  When the frame is correctly positioned on the tri-
pod base release the backstop.

3.  To move the winch into the working position rotate the 
winch forward slightly with your right hand while raising 
the brake arm with your left hand.

Содержание 138-2

Страница 1: ...013 Telpro Inc All Rights Reserved Form 42 01 00 00 version 6 For Model 138 2 Before operating this equipment thoroughly read this set of instructions make sure you understand them and only then follo...

Страница 2: ...fications Page 2 Care Maintenance Page 3 Assembly Pages 4 5 Operation Page 6 Disassembly Pages 7 8 Parts Index Pages 9 10 ASME Standards for Wire Rope Page 11 Cable Replacement Procedure Pages 12 16 E...

Страница 3: ...serious prop erty damage and or serious bodily injury Operate the PANELLIFT Drywall Lift only on hard flat level surfaces free of obstructions debris clutter pits holes or open ings Failure to follow...

Страница 4: ...C Cradle cross arms 1 pair Designed for operation on hard Level Surface at room Temperature in a dry environment avoid moisture and water See Pages 1 3 9 for important operational warnings Net Weight...

Страница 5: ...t Drywall Lift in a dry place Do not allow grease or oil to contact the surface of the winch brake drum Powdered gypsum applied to the brake will help dry the surface Apply household paraffin to the s...

Страница 6: ...the tripod base 2B Pocket A slides OVER angle B while angle C slides INSIDE angle D A B D C ASSEMBLY 4 2C To hold the tripod base in position during this procedure set the backstop as shown 2D When t...

Страница 7: ...ged in one of these three positions before loading the unit DO NOT use the PANELLIFT with the outriggers extended beyond the 33 point Retract the outriggers when storing or transporting the unit 5 Pla...

Страница 8: ...NELLIFT Drywall Lift 1 To Load Set the backstop on the tripod base to hold the unit in position Extend the cradle outriggers to properly support the drywall tilt the cradle and swing out the cross arm...

Страница 9: ...e off of the frame 4 Rotate the winch forward one full rotation 5 Raise up on the slide bar with your left hand while rotat ing the slide bar lock counter clockwise with your right hand 6 While holdin...

Страница 10: ...ck in the closed position DISASSEMBLY continued 8 Hold the retaining hook in this position with your left hand and rotate the winch forward with your right hand This will cause the winch assembly to f...

Отзывы: