SMARTZONE G6 IRUPS USER MANUAL
18
18. Align the mounting brackets with the screw holes on the rack and secure the EBP with
the supplied 4x Phillips Hex Head M5 screws (see Figure 18).
Figure 18: Secure the Mounting Brackets to the Rack
3U UPS Units (U05N11V, U05S11V, U06N11V, U06S11V, U06N12V, U06S12V,
U10N11V, U10S11V, U10N12V, U10S12V, U10N32V, U10S32V, U15N32V, U15S32V,
U20N32V, U20S32V)
1. Install the rail kit:
2. Install the front side of the rail kit with 3x Phillips Pan Head M5 screws (see Figure 19)
on each rail. Do not tighten the screws.
Содержание Smartzone U01N11V
Страница 63: ...SMARTZONE G6 IRUPS USER MANUAL 62 Appendix C What s Included 1 3kVA EBP UVP024 UVP036 UVP048 UVP072 ...
Страница 66: ...SMARTZONE G6 IRUPS USER MANUAL 65 Appendix F What s Included 5 10kVA EBP UVP240 ...
Страница 67: ...SMARTZONE G6 IRUPS USER MANUAL 66 Appendix G What s Included 10 20kVA EBP UVP480 ...
Страница 68: ...SMARTZONE G6 IRUPS USER MANUAL 67 Appendix H What s Included Maintenance Bypass Switch UMB20K ...