© Panduit Corp. 2013
OPERATION MANUAL
PAT1M, PAT1.5M, PDM
ENGLISH
Page: 29 of 39
4. Replace the left hand housing in position and fasten the left hand housing to the tool using the 4 socket head cap
screws and 1 tool holder bolt (removed in Step 2). See Fig. 11 (above) for the appropriate screw locations. Use
a 2.5 mm hex wrench to torque the cap screws to 60 oz - in (0,42 Nm) and use a screwdriver to torque the tool
holder bolt to 80 oz - in (0,57 Nm).
5. Replace tip collector and attach PHM Feeder Hose as required to resume operation.
The following maintenance procedures may be required every 250,000 cycles or more. Contact your maintenance
department as required to perform the following procedures at the prescribed intervals.
INTERVAL
UNIT
MAINTENANCE PROCEDURE
Every 250 000 cycles
(=50 cable tie reels)
PAT1M
PAT1.5M
Replace tool transfer tube, if worn.
(Maintenance department must perform this procedure.)
Every 500 000 cycles
(=100 cable tie reels)
PAT1M
PAT1.5M
Clean tool sensor lens.
(Maintenance department must perform this procedure.)
PDM
Clean dispenser exit sensor lens.
(Refer to
Cleaning the Dispenser Exit Sensor Lens
section below.)
Clean and regrease piston and O-rings in connection block.
Regrease worm gears.
(Maintenance department must perform this procedure.)
8C: Cleaning The Dispenser Exit Sensor Lens
Disconnect the PHM Feeder Hose from the PDM Dispenser. Dampen one end of a cotton swab with isopropyl
alcohol and insert the dampened end of the cotton swab into the dispenser transfer tube about 1.5" (38 mm) and
gently move the cotton swab in and out, against the top and bottom walls of the transfer tube until clean. Reconnect
the feeder hose to the dispenser and resume operation.