
INSTRUCTIONS CM385E
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
E-mail:
Fax
:
(708)444-6448
www.panduit.com
Page 12 of 12
Ganging of Two CN7018-EXT
NOTE:
Cabinets must be aligned and level prior to installation of ganging hardware.
See latest revisions of CM317 and CM385.
TOP CAP GANGING:
Remove [2] circular knockouts on sides of top cap at front and rear ganging locations
(remove knockouts prior to
positioning of cabinet)
. With cabinet top caps touching, secure cabinet tops together with [1] 5/16” serrated bolt and [1] 5/16” serrated
nut at each ganging location
(use 1/2” [13mm] socket)
.
BASE OF CABINET GANGING:
With cabinet bases touching, secure cabinet bases together with [2] 1/4” x 2-1/2” bolts
(use 7/16”
[11mm] socket; bolts fasten into 1/4” tapped holes in cabinet base)
at the front and rear of cabinet as shown below.
Remove [2]
Knockouts
TOP CAP GANGING
BASE OF CABINET GANGING
(Front)
BASE OF CABINET
GANGING
(Rear)
5/16” Serrated Bolt
5/16” Serrated Nut
1/4” Tapped Hole
1/4” x 2-1/2” Bolt
1/4” x 2-1/2” Bolt