NOTE!
•
When operating a 10 GPM tool you cannot have any other tool connected to
the 5 GPM ports, even if the tool is not being used.
5.
Operation
Always check the power unit’s hydraulic fluid level and fill reservoir as required before
starting
•
To start the power unit, check to make sure that both control valves are in the "OFF" position.
•
Depress the start button on the breaker box located on the front of theunit.
•
Connect the power transmission hose to either the 5 or 10 GPM ports, depending on the flow required for the
tool you will be using.
•
Connect the tool(s) to the power transmission hose before turning control valves at power unit "ON".
•
Rotate appropriate flow control valves. (See “valve positioning” in this manual.)
•
To change tools, turn the control valves to the off position.
•
To shut down the power unit turn the control valves to the "OFF" position and depress the red stop button on
the breaker box.
5.1. Valve positioning
The 03700a power unit is designed to operate either (1) tool at 10 GPM (38 LPM) or (2) tools simultaneously at 5
GPM (19 LPM). Refer to operating instructions for each tool to determine flow requirements.
BEFORE STARTING!
•
This power unit is driven by an electric motor. It is factory wired for the
voltage requested by the purchaser. Electrical contacts and wiring vary at
different locations. Due to this, have a qualified person or technician ensure
electrical system compatibility
9 av 34
OPERATION AND MAINTENANCE MANUAL I ENG_OMM_ELECTRIC_POWER_UNIT_P01 I 30th November 2021
@Pandrol 2021