Connection
OMCTT5621E18
26
• Wiring procedures
Function of each terminal
(1) Connect the wires to the jig terminals
Route it so that the end part of the wire can be placed
on the binding band holder.
(2) Pass the binding band through the binding band
holder, and then connect the signal wires.
(3) Allow some margin to the wires and bind them to the
grommet.
A
Binding band holder
Binding band
Jig terminal
Signal
wire
<View from A>
Bind with binding band
Allow some margin
Terminal #
Terminal
name
Functions
Note
I
N
P
U
T
1
Emergency
stop
Remove the jumper between the terminals 1 and
2 before connection.
• Open between those terminals and the welding
power supply comes to an emergency stop.
• To restart, close those terminal and then turn on
power switch again.
Open: 15 VDC
Close: 3mA DC (approx.)
2
Water circuit
Remove the jumper between the terminals 2 and
3 before connection.
• Open between those terminals and the welding
power supply stops the output.
• Connect the flow switch of the cooling water.
• To restart, close those terminal and then turn on
power switch again.
Open: 15 VDC
Close: 3mA DC (approx.)
3
6
7
4
5
3
2
1
Jumper
Jig terminal block
Содержание YC-300BZ3YHD
Страница 50: ...Parts list OMCTT5621E18 50 12 Parts list ...
Страница 52: ...Circuit diagram OMCTT5621E18 52 13 Circuit diagram ...
Страница 53: ...Circuit diagram OMCTT5621E18 53 ...
Страница 59: ...OMCTT5621E18 59 ...