60
WARNING
15. Maintenance
Guide
In order to ensure optimal performance of the unit, checks and inspections on the unit and the field wiring must be
carried out regularly.
Before carried out any maintenance or repair work, and removing the front plate of heat exchanger unit, always
switch off all power supply (i.e. indoor unit power supply, heater power supply and sanitary tank power supply).
Below checks must be carried out at least once a year.
1 Water
pressure
Water pressure should not lower than 0.05 MPa (with inspects the pressure gauge). If necessary add tap
water into boiler tank. Refer to boiler tank installation instruction for details on how to add water.
2 Pressure relief valve
o
Check for correction operation of pressure relief valve by turn up the lever to become horizontal. (Refer
to figure below)
o
If you do not hear a clacking sound (due to water drainage), contact your local authorized dealer.
o
Turn down the lever after checking finish.
o
In case the water keeps drained out from the unit, switch off the system, and then contact your local
authorized dealer.
3 Air purge valve
Air purge valve must be installed at all high points in a closed water circuit system.
An automatic air purge valve is provided inside the indoor unit. To automatically purge the air from the
system, turn the plug on the air outlet anticlockwise by one complete turn from fully closed position.
Excessive air is automatically purged if the plug is kept in this position.
4 Indoor unit control board area
Thorough visual inspection of the control board and look for defects, i.e. loose connection, melting of wire
insulator and etc.
5 RCCB/ELCB
Ensure the RCCB/ELCB set to “ON” condition before check RCCB/ELCB.
Turn on the power supply to the indoor unit.
This testing could only be done when power is supplied to the indoor unit.
Be careful not to touch parts other than RCCB/ELCB test button when the power is supplied to Indoor Unit. Else, electrical
shock may happen.
o
Push the “TEST” button on the RCCB/ELCB. The lever would turn down and indicate “0” and indicate
green colour if it functions normal.
o
Contact authorized dealer if the RCCB/ELCB malfunction.
o
Turn off the power supply to the indoor unit.
o
If RCCB/ELCB functions normal, set the lever to “ON” again after testing finish.
Содержание WH-SHF09D3E5
Страница 10: ...10 4 Location of Controls and Components 4 1 Indoor Unit 4 1 1 Location of Control ...
Страница 11: ...11 ...
Страница 12: ...12 ...
Страница 13: ...13 4 1 2 Weekly Timer Setting ...
Страница 14: ...14 4 1 3 Setting Up the Special Functions ...
Страница 15: ...15 4 1 4 Main Components 4 2 Outdoor Unit ...
Страница 16: ...16 5 Dimensions 5 1 Indoor Unit ...
Страница 17: ...17 5 2 Outdoor Unit ...
Страница 19: ...19 ...
Страница 20: ...20 7 Block Diagram ...
Страница 21: ...21 8 Wiring Connection Diagram 8 1 Indoor Unit 8 1 1 WH SHF09D3E5 ...
Страница 22: ...22 8 1 2 WH SHF12D6E5 ...
Страница 23: ...23 8 2 Outdoor Unit ...
Страница 24: ...24 9 Electronic Circuit Diagram 9 1 Indoor Unit 9 1 1 WH SHF09D3E5 ...
Страница 25: ...25 9 1 2 WH SHF12D6E5 ...
Страница 26: ...26 9 2 Outdoor Unit ...
Страница 27: ...27 10 Printed Circuit Board 10 1 Indoor Unit 10 1 1 Main Printed Circuit Board ...
Страница 28: ...28 10 1 2 Solar Printed Circuit Board Optional ...
Страница 29: ...29 10 2 Outdoor Unit 10 2 1 Main Printed Circuit Board ...
Страница 30: ...30 10 2 2 Capacitor Printed Circuit Board 10 2 3 Noise Filter Printed Circuit Board ...
Страница 53: ...53 ...
Страница 102: ...102 17 3 To Remove Pressure Gauge 17 4 To Remove Control Panel ...
Страница 103: ...103 17 5 To Remove RCCB ELCB 17 6 To Remove Transformer and Electronic Controller Board ...
Страница 110: ...110 19 2 WH UH09DE5 WH UH12DE5 ...
Страница 111: ...111 ...