58
12.4. Outdoor Unit
12.4.1. INSTALL THE OUTDOOR UNIT
• After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and
horizontally by bolt nut (ø10 mm).
2. When installing at roof, please consider strong wind and
earthquake. Please fasten the installation stand firmly
with bolt or nails.
12.4.2. CONNECTING THE PIPING
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge. Make flare after inserting the flare nut (locate
at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque wrench to the specified torque as stated in the table.
Local pipes can project in any of four directions.
• Make holes in the pipe panels for the pipes to pass through.
• Be sure to install the pipe panels to prevent rain from getting
inside the outdoor unit.
[Removing the service panel].
(1) Remove the three mounting screws.
(2) Slide the service panel downward to release the pawls.
After this, pull the service panel toward you to remove it.
Model
Piping size (Torque)
Gas
Liquid
SDF12C6E5/UD12CE5**, SDF14C6E5/UD14CE5**, SDF16C6E5/UD16CE5**
ø15.88mm (5/8”) [65 N•m]
ø19.52mm (3/8”) [42 N•m)
Do not over tighten, over tightening cause gas leakage.
Содержание WH-SDF07C3E5
Страница 16: ...16 4 Location of Controls and Components 4 1 Indoor Unit 4 1 1 Location of Control ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 4 1 2 Weekly Timer Setting ...
Страница 20: ...20 4 1 3 Setting Up The Special Functions ...
Страница 21: ...21 4 1 4 Main Components 4 2 Outdoor Unit ...
Страница 22: ...22 5 Dimensions 5 1 Indoor Unit ...
Страница 23: ...23 5 2 Outdoor Unit 5 2 1 WH UD07CE5 A WH UD09CE5 A ...
Страница 24: ...24 5 2 2 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A ...
Страница 26: ...26 ...
Страница 27: ...27 7 Block Diagram 7 1 WH UD07CE5 A WH UD09CE5 A ...
Страница 28: ...28 7 2 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A ...
Страница 29: ...29 8 Wiring Connection Diagram 8 1 Indoor Unit 8 1 1 WH SDF07C3E5 WH SDF09C3E5 ...
Страница 30: ...30 8 1 2 WH SDF12C6E5 WH SDF14C6E5 WH SDF16C6E5 ...
Страница 31: ...31 8 2 Outdoor Unit 8 2 1 WH UD07CE5 A WH UD09CE5 A ...
Страница 32: ...32 8 2 2 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A ...
Страница 33: ...33 9 Electronic Circuit Diagram 9 1 Indoor Unit 9 1 1 WH SDF07C3E5 WH SDF09C3E5 ...
Страница 34: ...34 9 1 2 WH SDF12C6E5 WH SDF14C6E5 WH SDF16C6E5 ...
Страница 35: ...35 9 2 Outdoor Unit 9 2 1 WH UD07CE5 A WH UD09CE5 A ...
Страница 36: ...36 9 2 2 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A ...
Страница 37: ...37 10 Printed Circuit Board 10 1 Indoor Unit 10 1 1 Main Printed Circuit Board ...
Страница 38: ...38 10 1 2 Solar Printed Circuit Board Optional ...
Страница 39: ...39 10 2 Outdoor Unit 10 2 1 WH UD07CE5 A WH UD09CE5 A 10 2 1 1 Main Printed Circuit Board ...
Страница 40: ...40 10 2 1 2 Capacitor Printed Circuit Board 10 2 1 3 Noise Filter Printed Circuit Board ...
Страница 41: ...41 10 2 2 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A 10 2 2 1 Main Printed Circuit Board ...
Страница 42: ...42 10 2 2 2 Capacitor Printed Circuit Board 10 2 2 3 Noise Filter Printed Circuit Board ...
Страница 65: ...65 Under solar priority is not set condition solar 3WV only can ON during heating heat up interval ...
Страница 73: ...73 ...
Страница 74: ...74 ...
Страница 120: ...120 18 3 To Remove Pressure Gauge 18 4 To Remove Control Panel ...
Страница 121: ...121 18 5 To Remove RCCB 18 6 To Remove Transformer and Electronic Controller Board ...
Страница 138: ...138 20 2 WH UD07CE5 A WH UD09CE5 A ...
Страница 139: ...139 ...
Страница 142: ...142 20 3 WH UD12CE5 A WH UD14CE5 A WH UD16CE5 A ...
Страница 143: ...143 ...