68
WARNING
15. Maintenance
Guide
In order to ensure optimal performance of the unit, seasonal inspections on the unit, external filter and field wiring
have to be carried out at regular intervals. This maintenance should be carried out by authorized dealer.
1 Water
pressure
Water pressure should not lower than 0.05 MPa (with inspects the pressure gauge). If necessary add tap
water into tank unit. Refer to tank unit installation instruction for details on how to add water.
2 Pressure relief valve
o
Take out the cover with remove the mounting screw for access to the pressure relief valve.
o
Move the lever into a horizontal position to open the valve.
o
If you do not hear a clacking sound (due to water drainage), contact your local authorized dealer.
o
Push the lever back down after you have finished the check.
o
If the water continues to drain from the unit switch off the system and contact your local authorised
dealer.
o
Reinstall the cover with tighten the mounting screws properly, if the pressure relief valve is functioning
normal.
3 Air purge valve
Air purge valve must be installed at all high points in a closed water circuit system.
An automatic air purge valve is provided inside the indoor unit. To automatically purge the air from the
system, turn the plug on the air outlet anticlockwise by one complete turn from fully closed position.
Excessive air is automatically purged if the plug is kept in this position.
4 RCCB
Ensure the RCCB set to “ON” condition before check RCCB.
Turn on the power supply to the Mono bloc unit.
This testing could only be done when power is supplied to the Mono bloc unit.
Be careful not to touch parts other than RCCB test button when the power is supplied to Mono bloc unit. Else,
electrical shock may happen.
o
Push the “TEST” button on the RCCB. The lever would turn down and indicate “0”, if it functions normal.
o
Contact authorized dealer if the RCCB malfunction.
o
Turn off the power supply to the Mono bloc unit.
o
If RCCB functions normal, set the lever to “ON” again after testing finish.
Содержание WH-MDC06E3E5
Страница 10: ...10 4 Location of Controls and Components 4 1 Mono Bloc Unit ...
Страница 11: ...11 4 1 1 Main Components ...
Страница 13: ...13 ...
Страница 14: ...14 ...
Страница 15: ...15 4 1 3 Weekly Timer Setting ...
Страница 16: ...16 4 1 4 Setting Up The Special Functions ...
Страница 17: ...17 5 Dimensions 5 1 Mono Bloc Unit ...
Страница 18: ...18 6 Refrigeration and Water Cycle Diagram ...
Страница 19: ...19 ...
Страница 20: ...20 7 Block Diagram ...
Страница 21: ...21 8 Wiring Connection Diagram ...
Страница 22: ...22 ...
Страница 23: ...23 9 Electronic Circuit Diagram ...
Страница 24: ...24 ...
Страница 25: ...25 10 Printed Circuit Board 10 1 Water System 10 1 1 Main Printed Circuit Board ...
Страница 26: ...26 10 1 2 Solar Printed Circuit Board Optional ...
Страница 27: ...27 10 2 Refrigerant System 10 2 1 Main Printed Circuit Board ...
Страница 28: ...28 10 2 2 Capacitor Printed Circuit Board 10 2 3 Noise Filter Printed Circuit Board ...
Страница 29: ...29 11 Installation Instruction Mono Bloc Unit Dimension Diagram ...
Страница 30: ...30 Main Components ...
Страница 39: ...39 Cool Mode Operation Time Chart 12 1 4 Cool Tank Mode Operation ...
Страница 41: ...41 ...
Страница 42: ...42 ...
Страница 48: ...48 ...
Страница 49: ...49 ...
Страница 59: ...59 Solar Priority Not Set Heat Tank Mode Heating Priority Set ...
Страница 60: ...60 Tank Mode Solar Priority Set Solar Priority Not Set ...
Страница 109: ...109 17 3 To Remove The Cabinet Rear Plate 17 4 To Remove Pressure Gauge ...
Страница 110: ...110 17 5 To Remove RCCB 17 6 To Remove Transformer and Electronic Controller Board ...
Страница 117: ...117 18 4 Hydraulic Pump Performance ...
Страница 118: ...118 19 Exploded View and Replacement Parts List 19 1 WH MDC06E3E5 WH MDC09E3E5 Refrigerant System ...
Страница 119: ...119 ...
Страница 122: ...122 19 2 WH MDC06E3E5 WH MDC09E3E5 Water System ...