Note:
When assembling the P(Multi)-Board and the P(Sus)-
Board, the position of each hole of the insulation sheets(A,
B, C, D) is set to the position of each hole of the P(Multi)-
Board and the P(Sus)-Board and then assemble them. (
marks indicate setting positions.)
P-Board back side
P-Board back side
6.4. Remove the Tuner unit
1. Unlock the cable clampers to free the cable.
2. Disconnect the connectors (A1, A5, A6, A7, A12 and A52).
3. Remove the screws (×2
) and remove the tuner cover.
4. Remove the screws (×4
) and remove the tuner unit.
10
TH-58PE75U
Содержание Viera TH-58PE75U
Страница 4: ...1 Applicable signals 4 TH 58PE75U ...
Страница 17: ...8 Location of Lead Wiring 8 1 Lead of Wiring 1 17 TH 58PE75U ...
Страница 18: ...8 2 Lead of Wiring 2 18 TH 58PE75U ...
Страница 19: ...8 3 Lead of Wiring 3 19 TH 58PE75U ...
Страница 23: ...9 4 No Picture 23 TH 58PE75U ...
Страница 30: ...11 4 Adjustment Volume Location 11 5 Test Point Location 30 TH 58PE75U ...
Страница 32: ...32 TH 58PE75U ...
Страница 34: ...34 TH 58PE75U ...
Страница 59: ...15 Schematic and Block Diagram 15 1 Schematic Diagram Note TH 58PE75U 59 ...
Страница 107: ...16 Exploded Views Replacement Parts List 16 1 Exploded Views 107 TH 58PE75U ...
Страница 108: ...16 2 Packing Exploded Views Accessories box 108 TH 58PE75U ...
Страница 109: ...16 3 Packing Exploded Views Stand 109 TH 58PE75U ...
Страница 110: ...16 4 Replacement Parts List Notes 110 TH 58PE75U ...