6. Mounting multiple units
①
Insert the pins into the holes in the
adjacent installation mount.
②
Fasten the adjacent frames together using
the frame linking screws, nuts, fl at washers
and spring washers
Ⓒ
.
(Tightening torque: 3.5 to 4.5 N·m)
③
Now repeat
①
and
②
to interlink the other
units.
* When mounting multiple units, see below
for the order in which the units should be
mounted.
④
If necessary, fasten to the mount surfaces
of the respective installation mounts.
■
Example of order for mounting multiple units: When interlinking 6 units
①
Mount the unit that will serve as the base position (
1
).
②
Successively mount the units in a row to the right of the base position unit (
2
and
3
).
③
Mount the unit above the base position unit (
4
).
④
Successively mount the units in the row to the right of unit
4
(
5
and
6
).
Base position
1
5
2
6
3
4
Ⓒ
Frame linking screws
fl at washers and spring washers
Pins
nuts
Содержание TY-VK47LV1
Страница 3: ...3 日本語 安全上のご注意 4 5 構成部品 6 取り付け工事手順 7 12 機器本体の取り外しかた 13 もくじ ...
Страница 14: ...14 中文 内容 安全注意事项 15 零部件 16 安装步骤 17 22 如何从安装支架上卸下监视器 23 ...
Страница 84: ...84 Українська Зміст Запобіжні заходи 85 Деталі 86 Монтаж 87 92 Демонтаж дисплея з Кріплення 93 ...
Страница 96: ...Web Site http panasonic net Panasonic Corporation 2014 S0914 0 W0914TS1047 PB ...