7-25
7.2.12.
Setting the FPC HDD BAT
1. Fix the FPC HDD BAT using the Screw. <N16>
2. Connect the 2 Cables to the 2 Connectors. (CN7,CN8)
3. Connect the Cable to the Connector. (CN800)
4. Attach the PAD Protect Sheet.
5. Connect the Cable to the Connector. (CN9)
6. Attach the Tape.
7. Connect the 2 Cables to the 2 Connectors. (CN10,CN26)
8. Attach the Tape.
9. Attach the Antenna Cable Sheet on the Main PCB.
10. Fix the HDD FPC BAT using the 4 Screws. <N29> No1 to
No4
Note:
Tighten the Screws in the numbered order (No1 to No4).
Screw <N16>: E5FKL
Screw <N29>: E3FNL
■
Preparation of HDD FPC ASSY
<N29>
<N16>
<N29>
Connector(CN10)
Connector(CN26)
HDD
Cable
Cover
FPC
HDD
BAT
Antenna
Cable
Sheet
to
Connector
(CN800)
Connector
(CN800)
to
Connector
(CN26)
Tape
Connector(CN9)
Pad
PCB
Tape
to
Connector
(CN8)
to
Connector
(CN7)
Connector
(CN8)
Pad
Protect
Sheet
Connector
(CN7)
No.3
<N29>
No.2
<N29>
No.1
No.4
Not
to
forget
folding
Tighten
of
Screw
Tighten
of
Screw
Battery
Connector
PIN
Cushion
is
set
Battery
Connector
PIN
is
set
Battery
Guide
is
set
Order
of
fixing
Screw
Screw
Fold
mountain
based
on
the
white
line.
Not
to
forget
folding