7-18
■
Assembly of Power SW
12
2
25
2
10
1
3
5
Attach
the
Battery
Cushion
Attach
the
DC
Gasket
Tighten
of
Screw
Power
SW
LED
Panel
is
set
FPC
Power
SW
is
set
Safety
Working
Attach
the
TP
FPC
Tape
Cable
Power
Connection
*
Notes:
1.
Apply
the
load
when
attaching
the
parts.
20N
to
30N
(2
to
3Kgf)/cm2
Battery
Pack
Insertion
Slot
Attach
the
Battery
Slide
Sheet
(on
Battery
Cushion)
Avoid
air
leaking
into
it.
Avoid
coming
off
4
corners.
Fit
to
the
line.
Ensure
the
upper
and
lower
Flex
holes
match.
CAB
Wall
Connection
Direction
Connection
Direction
Top
Bottom
Match
the
Cabinet
slit
and
the
tape
slit.
Do
not
run
the
Cabinet
edge
out
of
the
tape
slit.
CAUTION
S1:Insulation
S2:Pinching
Cables
S3:Sharp
Edge
S4:Part
No.
Check
S5:Others
S3