background image

4.3 Heat reserving test

The above conditions are proper.

1. Put approx. 1 liter of water and the thermometer [ repairing tool (mercury thermometer ASN-150H) ]
    in the pan, close the lid and turn on the boiling switch.

4.4 Hinge cover removal (Hinge cover)

1. Remove the dew collector.
2. Remove the hinge cover mounting screws.
3. As show in the figure, insert a narrow flat head screwdriver from just below and pry off the hinge cover.

2. When the beings boiling to generate steam turn off the boiling switch.

Within 69°C - 77°C .....................................Proper 

If outside 69°C - 77°C, check triac mounting for irregularity, if it is proper, replace warming heater.

3. Add water or keep the lid opened until the reading of the thermometer falls to approx. 70°C.
4. When it becomes approx. 70°C, close the lid. After the warming heater is activated for 1 hour or more,
    check the heat reserving temperature. 

Top view of pan

Holes on the
tissue paper

Pan flange

Tissue paper

Mercury thermometer

Urethane foam blocks

Mercury thermometer

Inner Pan

SR-TMG18

PDF.js viewer

file:///C:/Users/SH49A5~1.DEH/AppData/Local/Temp/Rar$EXa0.684/v...

9 of 19

2016/05/02 3:47 PM

Содержание SR-TMG18

Страница 1: ...PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 1 of 19 2016 05 02 3 47 PM ...

Страница 2: ...PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 2 of 19 2016 05 02 3 47 PM ...

Страница 3: ...PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 3 of 19 2016 05 02 3 47 PM ...

Страница 4: ...2 WIRING DIAGRAM nge Term SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 4 of 19 2016 05 02 3 47 PM ...

Страница 5: ...eing at Table 2 Explain the proper operation Isolate the cause which melt the thermal fuse correct the cause and Earlier cut off Poor boiling up Too hard Too soft Insufficient boiling Immediately after the switch is turned off open the cap Rice is excessive or insufficient Rice has not been scooped and mixed well Water is excessive or insufficient The switch is turned off once during boiling Is th...

Страница 6: ...d Rice is not washed sufficiently Water is excessive Bran remains still The pan bottom is conditioned to generate burning easily Are the parts on the P C B mistake Improper operation No Yes Yes Does the center thermostat operate properly Yes No Check with the evaporation test SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 6 of 19 2016 05 02 3 47 PM ...

Страница 7: ...he transformer Replace the relay Replace the relay Replace the transformer Replace the relay Replace the relay No Is the relay operation No Is the relay cut off Is the relay operation Yes Replace the P C B complete Yes No Replace the P C B complete Yes No Replace the P C B complete Yes Replace the P C B complete Yes Replace the P C B complete Yes Is the relay operation No Is the transformer operat...

Страница 8: ...pletely evaporated to be empty This timing is an follows Within 1 minute before the boiling switch is turned off Within 1 minute after the boiling switch is turned off Place a weight so that its gravity center may be aligned at the center 2 When it beings boiling to produce steam Remove the lid immediately check the bubbling condition on the pan bottom 3 As show in the figture If it is improper it...

Страница 9: ...o generate steam turn off the boiling switch Within 69 C 77 C Proper If outside 69 C 77 C check triac mounting for irregularity if it is proper replace warming heater 3 Add water or keep the lid opened until the reading of the thermometer falls to approx 70 C 4 When it becomes approx 70 C close the lid After the warming heater is activated for 1 hour or more check the heat reserving temperature To...

Страница 10: ...e in the arrow direction 2 The upper frame will be seperated from the inner enclosure and the upper frame Note When assembling refer to the illustration without the position relationship between the inner enclosure and the upper frame SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 10 of 19 2016 05 02 3 47 PM ...

Страница 11: ...w for bottom frame 4 Loosen a screw for P C B base 2 pcs 5 Use a screwdriver to pry bottom frame 6 Pulling out body from upper frame 7 Pulling out a switch ass y 8 Loosen screw for wiring 9 Loosen a screw for P C B from P C B base Screw SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 11 of 19 2016 05 02 3 47 PM ...

Страница 12: ...thermostat 3 Lift a thermostat Screw 4 8 Disassembly a side heater 1 Pulling out a side heater and after that if will replace new side heater keep a distance between 23 27 mm see a picture 23 27 SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 12 of 19 2016 05 02 3 47 PM ...

Страница 13: ...s Exploded View Body C 13 14 15 16 17 18 19 20 F G 23 1 2 4 3 5 6 7 9 8 10 11 12 24 29 30 31 32 25 26 H 27 B D E J 28 Panasonic MICROCOMPUTER 22 21 SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 13 of 19 2016 05 02 3 47 PM ...

Страница 14: ...5 2 Parts Exploded View Packing 7 8 2 6 3 4 5 1 SR TMG18 M E N U B O O K PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 14 of 19 2016 05 02 3 47 PM ...

Страница 15: ...ENT ARC00T9201W9 3 STEAM VENT HOLDING PACKING ARB82T920 4 HOOK LEVER ARE05H616 W9 5 HOOK LEVER SPRING ARE06H616 6 HOOK LEVER BASE ARC31H616 7 HANDLE COVER ARB15T920 W9 8 HANDLE ARB10T920 W9 9 LID CAUTION LABEL ARB32H920 ARB32L934 ARB32L934 ARB32K9361 10 OUTER LID COMP ARB01T934 WU ARB01M934 WU ARB01S934 WU ARB01L934 WU ARB01K934 WU 11 FLUORO PAN ARE50T9341 ARE50H616 12 CAST HEATER ASS Y ARL20T908 ...

Страница 16: ...H 21 DECORATIVE PANEL ARN21K934 UH 22 HINGE COVER ARE40H6161W9 23 DEW COLLECTOR ARK10H616 C0 24 BOTTOM FRAME UNIT ARH30T920W9U 25 FOOT RUBBER ARH90H663 26 NAME PLATE ARY30V934 CS ARY30M934 CS ARY30S934 CS ARY30L934 MB ARY30K934 MB 27 POWER CORD ASS Y ARQ00T934 0U ARQ00L934 0U ARQ00T920 0U ARQ00M96110U 28 INLET ARG10T9200U ARK53H616 W9 ASR792 454BK 29 STEAM BASKET 30 MEASURING CUP 31 SCOOP ASR79WT2...

Страница 17: ... SCREW F TAPPING SCREW XTN4 16AVW G TAPPING SCREW XTB4 25CFJ H Packing List REF NO PART NAME PART NO SAFETY REMARK COUNTRIES Q TY SIN RBD MAL SIN DBD INDO RUS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ARZ01V934 CS S S S S ARZ01M934 CS ARZ01S934 CS ARZ01L934 MB ARZ01K934 MB 1 ARZ04T920 0U UPPER PAD ASS Y INNER PACKING CASE 2 LOWER PAD ASS Y ARZ11T920 0U 3 RUST PROOF PAPER ASR758T344B 4 1 1 1 1 1 POLY...

Страница 18: ...TING FROM 1 TO 2 LAYER AUG 2011 1 2 ADD NEW PAGE FOR CONTENT IT S PAGE NO 2 2 2 18 NEW RUNNING PAGE NO SUBJECT NEW PAGE NO 2 18 3 16 CHANGE PART NO OF POWER CORD ASSY CHANGE 10A 250V TO 13A 250V SR TMG18 PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 18 of 19 2016 05 02 3 47 PM ...

Страница 19: ...PDF js viewer file C Users SH49A5 1 DEH AppData Local Temp Rar EXa0 684 v 19 of 19 2016 05 02 3 47 PM ...

Отзывы: