Maintenance
© Panasonic Industrial Devices SUNX Co., Ltd. 2020
124
4-3 Inspection after Maintenance
In the situations below, inspect all items listed in
Inspection (Every Six Months)”
1) When any parts of the device are replaced.
2) When an abnormal condition is noticed during operation.
3) After aligning the beam axes of the emitter and receiver.
4) When the installation site or environment of the device is changed.
5) When the wiring method or wiring layout is changed.
6) When a safety relay unit or external device (forcible guide relay or magnetic contactor)
part has been replaced.
7) When safety controller or safety PLC settings are changed.
Содержание SF4D-*-01 Series
Страница 2: ... Panasonic Industrial Devices SUNX Co Ltd 2020 2 MEMO ...
Страница 6: ... Panasonic Industrial Devices SUNX Co Ltd 2020 6 MEMO ...
Страница 120: ...Functions Panasonic Industrial Devices SUNX Co Ltd 2020 120 MEMO ...
Страница 134: ...Troubleshooting Panasonic Industrial Devices SUNX Co Ltd 2020 134 MEMO ...
Страница 168: ... Panasonic Industrial Devices SUNX Co Ltd 2020 168 MEMO ...