1. Safety Precautions
1.1. GENERAL GUIDELINES
1. When servicing, observe the original lead dress. If a short circuit
is found, replace all parts which have been overheated or
damaged by the short circuit.
2. After servicing, see to it that all the protective devices such as
insulation barriers, insulation papers shields are properly
installed.
3. After servicing, carry out the following leakage current checks to
prevent the customer from being exposed to shock hazards.
1.1.1. LEAKAGE CURRENT COLD CHECK
1. Unplug the AC cord and connect a jumper between the two
prongs on the plug.
2. Measure the resistance value, with an ohmmeter, between the
jumpered AC plug and each exposed metallic cabinet part on the
equipment such as screwheads, connectors, control shafts, etc.
When the exposed metallic part has a return path to the chassis,
the reading should be between 1M and 5.2M . / When the
exposed metal does not have a return path to the chassis, the
reading must be
.
Figure 1
6
Содержание SA-HT990E
Страница 25: ...10 2 Main Components and P C B Locations 10 3 Disassembly of Top Cabinet Step 1 Remove 4 screws 25 ...
Страница 63: ...63 ...
Страница 64: ...23 2 Packaging 64 ...
Страница 69: ...Q2101 B1GFGCAA0001 TRANSISTOR M 69 ...
Страница 71: ...DIODES 71 ...
Страница 86: ...R6922 ERJ3GEYJ182V 1 8K 1 16W M 86 ...
Страница 100: ...C5722 ECJ1VB1H104K 0 1 50V M 100 ...
Страница 102: ...C6922 ECJ1VB1H473K 0 047 50V M 102 ...
Страница 109: ......
Страница 110: ...SURROUND ENHANCER unt of power ...
Страница 119: ......
Страница 179: ......